My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006503
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5484
>
2600 - Land Use Program
>
PA-0700125
>
SU0006503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:14 PM
Creation date
9/9/2019 10:26:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006503
PE
2626
FACILITY_NAME
PA-0700125
STREET_NUMBER
5484
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
APN
05516023 24 25
ENTERED_DATE
4/3/2007 12:00:00 AM
SITE_LOCATION
5484 W HWY 12
RECEIVED_DATE
4/3/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\5484\PA-0700125\SU0006503\APPL.PDF \MIGRATIONS\T\HWY 12\5484\PA-0700125\SU0006503\CDD OK.PDF \MIGRATIONS\T\HWY 12\5484\PA-0700125\SU0006503\EH COND.PDF \MIGRATIONS\T\HWY 12\5484\PA-0700125\SU0006503\CERT OC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I � � <br /> ' not equivalent to asphalt concrete or Portland cement concrete. Accordingly, it will be <br /> necessary for the applicant to provide asphalt concrete or similar surfacing material <br /> approved by the Community Development Department. <br /> Access <br /> It appears that the applicant' is proposing access through Assessor Parcel•Number,p <br /> M (APN) 055=160-67. Furthermore, it is not clear if the applicant is'proposin g"access at the' <br /> entrance along State Route.12 between APN 055-160-72 and 055.160-73: As•a result, <br /> the applicant will be required to provide deeded ingress and"egress access rights.by <br /> means of APN 055-160-67 and will need to clarify whether access is going to be <br /> provided at the entrance of APN 055-160-72 and 055-160-73. <br /> f <br /> I-i htin <br /> Development Title Section 9-1015.5(2) (g) states that if parking areas to be used at <br /> night, parking lot and security lighting shall be installed. Furthermore, all lighting shall be <br /> designed to confine direct rays to the premises. No spillover beyond the property line is <br /> permitted, except onto public thoroughfares, provided, however, that such light shall not <br /> cause a hazard to motorists. (Development Title Section 9-1015[g][4]) Thus, since the <br /> proposed project will operate 24 hours a day, 7 days a week it will be necessary to <br /> provide lighting. <br /> Traffic Study <br /> • I <br /> The Department of Public Works is requiring a traffic study to be prepared. The <br /> Community Development Department cannot complete the Initial Study until the results <br /> of the traffic study have been reviewed by the Department of Public Works. <br /> Planning Commission <br /> Upon the completion and review of the traffic study by the Public Works Department, the <br /> Community Development Department will determine the recommendation to the <br /> Planning Commission, and schedule the project to be heard at the Planning <br /> Commission: If any issues surface from the traffic study or other issues arise, the <br /> Community Development Department may schedule another Development Committee{ <br /> meeting to discuss all issues prior to attending a Planning Commission meeting. <br /> AS:vb <br /> PA-0700125(U P)ASDC042507 <br /> Attachments <br /> C: Frank Alegre <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.