My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011183
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
7871
>
2600 - Land Use Program
>
PA-1600179
>
SU0011183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:16 PM
Creation date
9/9/2019 10:27:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011183
PE
2631
FACILITY_NAME
PA-1600179
STREET_NUMBER
7871
Direction
E
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240-
APN
05135007
ENTERED_DATE
1/13/2017 12:00:00 AM
SITE_LOCATION
7871 E HWY 12
RECEIVED_DATE
1/13/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\7871\PA-1600179\SU0011183\APPL.PDF \MIGRATIONS\T\HWY 12\7871\PA-1600179\SU0011183\CDD OK.PDF \MIGRATIONS\T\HWY 12\7871\PA-1600179\SU0011183\EHD COND.PDF \MIGRATIONS\T\HWY 12\7871\PA-1600179\SU0011183\EHD PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1600179 (SA) <br /> JOHN ANAGNOS/MIKE SMITH ENGINEERING, INC. <br /> Site Approval Application No. PA-1600179 was approved by the San Joaquin County Community <br /> Development Department on August 18, 2017. The effective date of approval is August 28, 2017. <br /> This approval will expire on February 27, 2019, which is 18 months from the effective date of <br /> approval, unless (1) all Conditions of Approval have been complied with (2) all necessary building <br /> permits have been issued and remain in force, and (3) all necessary permits from other agencies <br /> have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Megan Aguirre, 209-468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a small winery to be constructed in three phases over ten <br /> years as shown on the site plan dated January 6, 2017. Phase 1, with the building permit to be <br /> issued within 18 months from the effective date of approval, includes the construction of a 24,000 <br /> square foot multi-purpose building to be used for production, wine tasting, administration, and <br /> storage with a 6,000 square foot basement, a 12,000 square foot ground floor, and a 6,000 square <br /> foot second floor. Phase 2,with building permits to be issued within 5 years from the effective date of <br /> approval, includes construction of a 12,000 square foot storage building. Phase 3, with building <br /> permits to be issued within 10 years of the effective date of approval, includes construction of a <br /> 12,000 square foot storage building. (Use Type: Wineries and Wine Cellars - Winery, Small) No <br /> marketing events are proposed with this application. <br /> c. PRODUCTION CAPACITY:A small winery shall have a minimum production capacity of 201 gallons <br /> of wine per year and a maximum production capacity of 36,000 gallons of wine per year. <br /> (Development Title Section 9-1075.5[a]). <br /> d. TASTING ROOM: The maximum size of a stand alone wine tasting room or structure or area <br /> designated for wine tasting within a multipurpose building at an on-site wine cellar shall not exceed <br /> thirty percent (30%) of the area designated for production facilities or two thousand (2,000) square <br /> feet whichever is greater. (Development Title Section 9-1075.5[n][1][A]) <br /> e. SETBACKS: The following minimum yard setback requirements shall apply for small wineries <br /> developed in agricultural zones: <br /> (1) New construction or use of existing buildings, permanent parking areas and outdoor <br /> eating/entertaining areas associated with a proposed winery shall be set back a minimum of two <br /> hundered (200) feet from any highway, public road or private road, measured from the nearest <br /> property line to the road. (Development Title Section 9-1075.5[c][1] <br /> (2) All new construction, use of existing buildings, permanent parking areas and outdoor <br /> PA-1600179 (SA) Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.