My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004364
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8215
>
2600 - Land Use Program
>
PA-0200019
>
SU0004364
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:12 PM
Creation date
9/9/2019 10:27:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004364
PE
2632
FACILITY_NAME
PA-0200019
STREET_NUMBER
8215
Direction
E
STREET_NAME
STATE ROUTE 12
City
LODI
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
8215 E HWY 12
RECEIVED_DATE
1/22/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\8215\PA-0200019\SU0004364\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-26-2002 07 :30 AM MAKE SMITH ENGINEERING 209 734 0102 P. 02 <br /> Mike Smith Engineering, Inc. <br /> P.O. Box 611 Lodi, CA <br /> (209) 334-2332 <br /> September 26, 2002 <br /> San Joaquin County <br /> Environmental Health <br /> Attn: Ray Borges <br /> RE: New Winery For: <br /> Joe Berghold <br /> 821$ East Hwy 12 <br /> Lodi, Ca <br /> Per your request regarding clarification of the building use, the following letter will <br /> discuss this project in order to address your concerns. This project is a multi-phase project <br /> as described below: <br /> Phase I Convert an existing ag storage building into a winery process and barrel storage <br /> building, This building was constructed under permit approximately two years ago. A <br /> floor drain system was installed during the original construction, which drained to an <br /> above ground storage tank. This phase is currently in your department for approval. <br /> Phase 11 A tasting room and additional barrel storage within a new building. This will <br /> be the "show place" and trademark for the Berghold winery. This phase will begin spring <br /> 2003. <br /> Your specific concern was regarding the floor drain system in the existing ag storage <br /> building, and if vehicle maintenance would occur at this location. The surrounding <br /> vineyards are maintained by a local contract farmer, who keeps his equipment maintained <br /> and stored at a remote location. Berghold winery does not own any farm equipment. The <br /> area with the floor drains will be used exclusively for wine processing. There will be no <br /> vehicle maintenance in this building, or on this parcel. <br /> Sincerely, <br /> W is No C 45 z <br /> r� <br /> - 6 <br /> Michael W, Smith <br /> RC.E. No. 44590 S CIV14. ;5 <br /> Mike Smith Engineering OF Com! <br />
The URL can be used to link to this page
Your browser does not support the video tag.