too long. Consequently, only effluent will flow to the new 2,000 gal tank from this unit. The <br /> second residential unit near the intersection of Durham Ferry and Hwy 33 will connect to a new <br /> 2,000 gal tank, as will the residential unit directly to the north. Influent from the northernmost two- <br /> story garage will also flow to the new 2,000 gal tank. This 2,000 gal tank will be directly in- <br /> between and to the east of the two main residential units. <br /> Effluent discharging from the 2,000 gal tank(with a Polylok® filter on the outlet),will travel north <br /> and connect to a new 1,200 gallon tank that will also serve the restrooms of the Prayer and <br /> Mediation Center. The second chamber of this tank will be the pump chamber with a BioTube® <br /> filter vault with an alternating duplex pump system to pressurize effluent to the new filter bed. <br /> The filter bed will be constructed directly to the west of the 1,200 gal tank as a double-depth filter <br /> bed disposal field of 800 sq ft. The 100%reserve replacement area is denoted on the Site Plans as <br /> directly west of the primary filter bed. <br /> B. SEPTIC TANKS <br /> Septic tanks store the accumulated sludge, scum and effluent(clear zone)volumes, which in turn <br /> affect treatment of nitrogen within the tanks. Detention time will be individually calculated for each <br /> of the three new tanks to be installed, and demonstrates that when the Max ADF is applied to each <br /> tank, there is still sufficient detention time: <br /> Detention Time Calculation for each of the three new septic tanks: <br /> Detention Time=2 00 gal tank capacity x 0.70(30%volume lost to sludge/scum accumulation) <br /> \_ 2,5.{Peaking factor)x 300 MAX gals/day(ADF) <br /> Detention Timq= 1,200 gal (2) tank capacity x 0.90(10%volume lost to sludge/scum accumulation <br /> 2.5 (Peaking factor)x 300 MAX gals/day(ADF) <br /> Detention Time= 1.9 days for the 2,000 gal tank and 1.4 days for the two 1,200 gal tanks to be installed. <br /> The minimum acceptable detention time is 1.0 day. r—C. PRESSURIZED FILTER BED SIZING CALCULATIONS <br /> Base Tank Capacity(BTC)= 1,200 gal. The anticipated maximum daily flow of 300 gallons may <br /> occur on any given day of the week, 365 days per year. There will be days where no wastewater flow <br /> occurs. This ADF parameter is unknown. However, the calculations are based upon the 300 gals <br /> ADF occurring seven days per week, 365 days per year. <br /> Leachline Equivalent Requirement= 1,200 gallons BTC +300 MAX ADF x 0.250 clay Soil Factor <br /> (SF) =375 lineal feet of leachline,,(LFLL) required. 375 x 4 (Clay Soil -Filter Bed Soil Factor)_ <br /> -1,500 sq. ft. filter bed area required., Due to area constraints, a double depth filter bed will be <br /> constructed and increased in area to 14 ft wide by 57 ft long= 798 sq ft(1,600 sq ft). The total depth <br /> of the filter bed will be 39 inches as illustrated on the Project Plans. <br /> Page -9- <br />