Laserfiche WebLink
COUNTY OF SAN JOAQUIN EUGENE DELUCCHI <br /> DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON,CALIFORNIA 95201 DEPUTY DIRECTOR <br /> (209)468-3000 MANUEL LOPEZ <br /> DEPUTY DIRECTOR <br /> HENRY M. HIRATA RICHARD C.PAYNE <br /> DIRECTOR DEPUTY DIRECTOR <br /> September 19, 1990 `fiEP ,10 <br /> M E M 0 R A IQ D U M <br /> TO : Tom Walker , Deputy Director <br /> Planning and Building Inspection Department <br /> FROM : Charles Helley , Associate Civil Engineer <br /> Public Services Division <br /> SUBJECT : SA-91-32' to construct a 24 , 505 square foot office and <br /> manufacturing building to cut and fabricate tin cans . Located on <br /> the SW. side of State Highway Route 333 at Welty Road, Vernalis . <br /> AFFLICANT : Norman Hunter APN : 255-180-09 <br /> INFORMATION : <br /> The site i -- not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area . <br /> Welty Road has an existing right-of-way width of 40 feet , and a <br /> planned right-of-way width of 60 feel . <br /> ORDINANCE REQUIREMENTS : <br /> 1 . An Improvement Plan , prepared by a registered Civil <br /> Engineer , showing drainage , driveway access details , on-site <br /> parking, existing and proposed utility services , and grading , <br /> shall be submitted to the Department of Public Works for <br /> approval . <br /> 2 . Dedication to result in a 30 foot wide right-of-way from the <br /> centerline of Welty Road to the property line shall be <br /> required across the frontage of APN 255- 180-09 . <br /> 3 . The frontage improvement for Welty Road shall be <br /> constructed in conformance with the standards for one-half of <br /> a 60-foot right-of-way industrial street . The construction <br /> of the frontage improvements will be deferred upon execution <br /> by the owner of a Deferred Frontage Improvement Agreement <br /> prior to approval of the Improvement Plan . ( A $250 . 00 fee is <br /> required for processing per Ord . NO . 3337 in addition to a <br /> copy of the Grant Deed and an estimate for, the required <br /> frontage improvements . The estimate shall be prepared by a <br /> Registered Civil Engineer with a typical section drawing on a <br /> form to be supplied by the Public Works Department and <br /> submitted to the Public Works Department for approval . As an <br /> option the Department of Public Works will prepare the <br /> drawing and estimate for an additional fee of $ 100.00. ) <br />