Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-91-3 <br /> 4 . Encroachment permit shall be required for work within road <br /> right-of-way . <br /> S . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of <br /> building permit application . ( The fees are $ 1 , 987 .00 per <br /> 1 , 000 groes square feet of building as "Office" and $796 . 00 <br /> per 1 , 000 gross squire feet of building as "Manufacturing" in <br /> the Tracy area . The fee shall lie automatically adjusted <br /> annually by the Engineering Construction Cost Index as <br /> published by the Engineering News Record . ) <br /> 6 . Public water and sanitary sewer services shall be required <br /> when available . <br /> 7 . A terminal drainage system is allowed only if approval from <br /> the West Stanislaus irrigation District has been provided . <br /> An on-:lite storm drainage retention pored shall be provided <br /> if run-off is not accepted by the West StanisIaus Irrigation <br /> District . Run-off and pond capacity calculations shall be <br /> submitted for approval . <br /> c : Manuel Lopez <br /> Deputy Director /Development <br />