Laserfiche WebLink
l ( � <br /> Love's Travel Stops Final EIR - MITIGATION MONITORING/REPORTING PROGRAM <br /> Mitigation Measures Monitoring Monitoring Action Initial of Findings/ Rationale <br /> Phase AgencylDept. Indicating Reviewing Significance <br /> Compliance Agency's After <br /> Personnel Mitigation <br /> TRANS 5.7-1: The proposed island south of the northernmost driveway shall be modified so as During Design San Joaquin Issuance of LS Draft EIR <br /> to allow the off-tracking of STAA trucks,as illustrated in Figure 10 of the Kimley-Hom and Review and County Public Certificate of pp.5-26 <br /> Associates traffic impact analysis of the Project (see Appendix C and also Figure 5-4 of Construction Works Occupancy through 5- <br /> this EIR). <br /> Department 28 <br /> TRANS 5.8-1: On-street parking shall be prohibited along the Project site frontage on North During Design San Joaquin Issuance of LS Draft EIR <br /> Thornton Road. Signage and striping indicating this prohibition shall be installed along this Review and County Public Certificate of pp.5-28 <br /> frontage in accordance with County standards. Prior to issuance of any building permits, Construction Works Occupancy through 5- <br /> the ODS shall submit a request, including payment of any fees, to the County Board of Department 29 <br /> Supervisors to establish this"no parking"zone along the Project site frontage. <br /> CumuTRANS 6.2-1: The ODS shall fund the necessary hardware and wiring to coordinate the During Design San Joaquin Issuance of CLI Draft EIR <br /> traffic signals at the State Route 12/North Thornton Road intersection, the State Route Review and County Public Certificate of pp,6-4 <br /> 12/Interstate 5 Northbound Ramp intersection, and the State Route 12/Interstate 5 Construction Works Occupancy through 6- <br /> Southbound Ramp intersection. The traffic signals shall be coordinated such that all Department 11; Final <br /> intersections during both AM and PM peak hours will attain at least a minimum of LOS EIR p.4-5 <br /> C. Traffic signal coordination shall be accomplished in coordination with, and to the Caltrans Written <br /> satisfaction of, Caltrans District 10 Traffic Electrical Branch. Prior to issuance of the District 10 Verification <br /> Traffic of Installation <br /> certificate of occupancy,written verification from Caltrans indicating compliance with this <br /> Electral <br /> mitigation measure shall be provided to the County. Branch <br /> Branch <br /> 127410/ST012R0851 6-4 November 30,2012 <br /> Love's Travel Stops Final EI R/MMRP <br />