Laserfiche WebLink
The plant shall be returned to design loading for seven days between each <br /> stressing sequence. <br /> 3. SAMPLING: <br /> L GENERAL: <br /> I: <br /> - The daily composite sample shah consist of flow-proportional samples <br /> collected at least once per hour during periods of influent flow. <br /> b. DESIGN LOADING: <br /> 4 <br /> The evaluaziou analyses as specified:in Appendix A. Table 1 shall be <br /> Mowed. <br /> - All samples shall be collected and apdyzed on a five-days-per week <br /> basis. <br /> C. STRESS TESTING: <br /> Samples collected immediately following each stressing shall include 24- <br /> hour composites of influem and effluent and analyzed in accaadar=with <br /> Appendix A. Table 1. <br /> Samples snail be collected immediately before the beginning of each <br /> sequence and each 24 hours for 7 days following each stress sequenm <br /> NOTE: TWO samples shall be collected during the woddng parent and wash day <br /> stresses and analyzed for BOD., SS. and pH. ;Ihe data shall not be used <br /> in deteun*mng acceptance. <br /> ,k <br /> �i <br /> I <br /> J <br /> y <br /> ij <br /> s <br /> B-4 <br /> a v. <br />