Laserfiche WebLink
Kerry Sullivan -3- J <br /> COMMUNITY DEVELOPMENT <br /> PA-02-247 <br /> 13. A sewer system shall be provided that meets the requirements of San Joaquin County <br /> Public Health Services Environmental Services Division. <br /> 14. The Applicant shall build a left tum lane into the project site. The lane shall be as <br /> determined in the Traffic Study for the project. <br /> 15. In the future Traffic Lights shall be required at the Northbound and Southbound Ramps <br /> onto Interstate Route 5. An Agreement, with the County, may be entered into for payment <br /> of fair share percentages as determined by the Traffic Study. The applicant shall pay the <br /> Department of Public Works a fee of$450.00 to process the Agreement to the Board of <br /> Supervisors. The fair share percentages and amounts are as follows: <br /> Southbound percentage: 6.0% Required fee $14,800.00 <br /> Northbound percentage 12.0% Required fee $24,200.00 <br /> Stop Sign Required fee $28.00 <br /> 16. A multi-purpose pathway shall be installed on the north side of Walnut Grove Road from <br /> the Walnut Grove Road/Thomton Road intersection to Mokelumne Street. <br /> NOTE: Project lies within CSA 12. CSA 12 provides water, storm drainage and lighting. <br /> There is no public sewer available to serve this project. <br /> GK:BN:ar <br /> PXOls4dENMA\Yr 2002TA42-247(mision 2),"d <br />