My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004225
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26485
>
2600 - Land Use Program
>
PA-0300417
>
SU0004225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:34 AM
Creation date
9/9/2019 10:38:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004225
PE
2632
FACILITY_NAME
PA-0300417
STREET_NUMBER
26485
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
26485 N THORNTON RD
RECEIVED_DATE
9/10/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\26485\PA-0300417\SU0004225\APPL.PDF \MIGRATIONS\T\THORNTON\26485\PA-0300417\SU0004225\CDD OK.PDF \MIGRATIONS\T\THORNTON\26485\PA-0300417\SU0004225\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -3- J <br /> COMMUNITY DEVELOPMENT <br /> PA-02-247 <br /> 13. A sewer system shall be provided that meets the requirements of San Joaquin County <br /> Public Health Services Environmental Services Division. <br /> 14. The Applicant shall build a left tum lane into the project site. The lane shall be as <br /> determined in the Traffic Study for the project. <br /> 15. In the future Traffic Lights shall be required at the Northbound and Southbound Ramps <br /> onto Interstate Route 5. An Agreement, with the County, may be entered into for payment <br /> of fair share percentages as determined by the Traffic Study. The applicant shall pay the <br /> Department of Public Works a fee of$450.00 to process the Agreement to the Board of <br /> Supervisors. The fair share percentages and amounts are as follows: <br /> Southbound percentage: 6.0% Required fee $14,800.00 <br /> Northbound percentage 12.0% Required fee $24,200.00 <br /> Stop Sign Required fee $28.00 <br /> 16. A multi-purpose pathway shall be installed on the north side of Walnut Grove Road from <br /> the Walnut Grove Road/Thomton Road intersection to Mokelumne Street. <br /> NOTE: Project lies within CSA 12. CSA 12 provides water, storm drainage and lighting. <br /> There is no public sewer available to serve this project. <br /> GK:BN:ar <br /> PXOls4dENMA\Yr 2002TA42-247(mision 2),"d <br />
The URL can be used to link to this page
Your browser does not support the video tag.