My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004193
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9350
>
2600 - Land Use Program
>
PA-0400086
>
SU0004193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:32 AM
Creation date
9/9/2019 10:39:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004193
PE
2632
FACILITY_NAME
PA-0400086
STREET_NUMBER
9350
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
9350 N THORNTON RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\9350\PA-0400086\SU0004193\APPL.PDF \MIGRATIONS\T\THORNTON\9350\PA-0400086\SU0004193\CDD OK.PDF \MIGRATIONS\T\THORNTON\9350\PA-0400086\SU0004193\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan <br /> COMMENTS ON DEVELOPMENT <br /> PA-04-86 <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $1,278.00 per 1,000 gross square foot of building <br /> designated as Service Commercial or$187.36 per additional daily trip-end generated in the Stockton area. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolutions 00-433) <br /> 2. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable prior to issuance of the building permit. (The fee currently is $569.00 per 1,000 gross square foot of <br /> building designated as Service Commercial. The fee shall be automatically increased on January 1 of each <br /> year through the year 2005 at the rate of 7.66 percent. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. A State National Pollutant Discharge Elimination System(NPDES)Construction Permit Notice of Intent <br /> (NOI)shall be filed with the State Water Resources Control Board if over one(1)acre of total ground is <br /> disturbed. <br /> 5. Applicant shall comply with all requirements of the Stormwater Quality Control Plan and shall obtain all <br /> necessary permits from the City of Stockton. <br /> DTP:DG:ar <br /> P:\COIv4.ffi'NTS\SA\YR 2004\PA-0400086.dm <br />
The URL can be used to link to this page
Your browser does not support the video tag.