Laserfiche WebLink
GRANITE CONSTRUCTION COMPANY <br /> TRACY EXCAVATION EXPANSION <br /> PAGE 4 <br /> 1 <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION <br /> A. MAP OF OPERATION - See enclosed maps, DWG 00-05, Behind Tab 5 <br /> B. PRODUCTION SCHEDULE <br /> Phase A-wumte Cv Overburden/Clav CY Years <br /> Area 1 800,000 300,000 1.0 <br /> Area 2 600,000 300,000 1.0 <br /> Area 3 800,000 300,000 1.0 <br /> Area 4 800,000 300,000 1.0 <br /> Area 5 800,000 300,000 1.0 <br /> Area 6 600,000 200,000 1.0 <br /> Total: 4,400,000 1,700,000 6 yrs. <br />