GRANITE CONSTRUCTION COMPANY <br /> TRACY EXCAVATION EXPANSION <br /> PAGE 7 <br /> Excavation depth would be variable and is estimated to be from 10 to 80 vertical feet below the existing <br /> ground elevation. Excavation slopes would be constructed at a gradient of 1.5:1 (horizontal to vertical) <br /> as allowed by a geotechnical slope stability analysis. Final slopes will be contoured 1.5:1 or flatter. The <br /> depth of excavation would terminate above the water table. Water was not encountered in any of the test <br /> boreholes to a depth of 125'. The maximum depth of excavation is approximately 80' deep. <br /> Following excavation, the mined areas would be graded as shown on DWG. 04, behind Tab 5. These <br /> areas would be re-seeded to native grasses and forbs and allowed to revert to an annual grassland habitat. <br /> D. SIZE <br /> 1. New acreage to be permitted: 137 acres <br /> 2. Total acreage to be disturbed: 111 acres <br /> 3. Total acreage to be reclaimed: 111 acres <br /> E. WATER REQUIREMENTS <br /> 1. The Existing processing plant uses 781 acre feet per year of groundwater, or an average of 2.14 acre feet <br /> per day. <br /> 2. The source of the water is from two existing wells located near the processing plant. The project will not <br /> increase the existing average annual water use. <br />