Laserfiche WebLink
GRANITE CONSTRUCTION COMPANY <br /> TRACY EXCAVATION EXPANSION <br /> PAGE 8 <br /> F. CONTAMINANTS <br /> Petroleum Products used to fuel and maintain the on site earthmoving and conveying equipment will be <br /> handled in compliance with all applicable laws and regulations regarding hazardous materials. Fuels and <br /> lubricants will not be stored on the site. <br /> G. WASTE WATER <br /> No wastewater will be generated from the project site. <br /> I. ORE PROCESSING <br /> No processing will occur on the site. All of the material will be transported by a conveyor from the <br /> project site, over the California Aqueduct, to the existing permitted processing facility on the east side of <br /> the California Aqueduct (QX-89-1). <br />