Laserfiche WebLink
Biological Resources, MONK &ASSOCIATES <br /> Impacts and Mitigations <br /> Tracy Facility Expansion.Site <br /> would be necessary. These surveys should continue in each new miningarea until cessation <br /> of mining. <br /> • Between April-June 2000, surveys for nesting California homed larks should be conducted <br /> in Area 1. If the California horned lark is removed from the.`Bird Species of Special <br /> Concern''list,then surveys would not be necessary. <br /> • 30 days prior to mining Area 1, a trapping and removal effort should take place to relocate <br /> San Joaquin pocket mouse: This trapping/removal effort should be repeated in each <br /> subsequent mining area 30 days prior to initiation of mining. <br /> • 30 days prior to mining in Area 1, surveys for American badger should be conducted. These <br /> surveys should be repeated in each subsequent mining area. <br /> • 60 days prior to mining Area 1, surveys for San Joaquin kit fox should be conducted. These <br /> surveys should be repeated in each subsequent mining area. <br /> II <br /> 41 <br />