Laserfiche WebLink
Gregoria Garcia <br /> Jennifer Jolley <br /> November 18, 2002 <br /> Page 5 <br /> 13.Project fencing is described but the reclamation plan needs to contain a <br /> statement that grazing will be excluded from the project site until the lead agency <br /> deems that the revegetation performance standards discussed under LAND END <br /> USE are met. <br /> Administrative Requirements <br /> L (Refer to SMARA Sections 2772 (c)(10),2773.1,2'774(b), 2776,2777, PRC Section 21151.7) <br /> 14.A signed statement of responsibility that reclamation will be completed should be <br /> included in the mining and reclamation plan in accordance with SMARA Section <br /> 2772(c)(10). <br /> If you have questions on these comments or require assistance with other mine <br /> reclamation issues, please contact me at (916) 323-8565. <br /> Jeclamaiion <br /> cerely, <br /> ..r <br /> mes SPomp , <br /> Man g <br /> Unitt <br />