Laserfiche WebLink
1. Description of Environmental Setting <br /> i The proposed quarry site is located in the Northeast 'A of Section 20, Township 3 South, <br /> e <br /> Range 5 East,MDB &M. The property lies east of I-580 and west of the California Aquaduct. <br /> (Assessor's Parcel Nos. 253-09-10 and 253-09-11). The proposed site is located south of <br /> I <br /> Granite's current Tracy Expansion (QX-99-1) mining property. Please refer to Figure 1: <br /> Vicinity Map and Site Location Map, for the exact location of this proposed site. <br /> A. Maps <br /> Please refer to Figure 1 for site access as well as topographical features. <br /> B. Geology <br /> The site is comprised of Sector A-1 q material as identified by the Department of <br /> i Conservation, Division of Mines and Geology (DMG), as well as areas undefined by the <br /> I <br /> DMG. This area is also identified as Mineral Resource Zones 2 and 3. In general the <br />+ composition of Sector A-1 is 55 percent gravel, 30 percent sand, and 15 percent silt/clay. The <br /> site lies within the Corral Hollow Creek Alluvial Fan, South of Tracy. (See DMG Aggregate <br /> Resource Sector Map and Special Report 160 excerpt attached--Appendix B). <br /> E. Vegetation/Wildlife <br /> The proposed site is located within areas that have been identified as potential habitat for the <br /> San Joaquin Kit Fox. Granite plans to participate in the San Joaquin Council of Governments <br /> (SJCOG) Habitat Conservation Plan to mitigate for this habitat loss. The Habitat Conservation <br /> plan consists of a program in which participating companies pay a set amount per acre to the <br /> COG for the purchase and upkeep of essential habitats in replacement of lost habitat. <br /> I. Aesthetics <br /> The proposed site is located adjacent to Interstate 580, a California scenic corridor, as <br /> indicated in Figures 1-5. In addition, the elevation of the majority of the site is below that of <br /> the interstate. To account for the visual effect of the mine, Granite Construction is proposing <br /> to provide a visual barrier to the interstate consisting of a type of tree that is both hearty and <br /> provides a substantial barrier. It is anticipated that these measures will greatly reduce visibility <br /> of the site from I-580. <br /> 3 <br />