Laserfiche WebLink
D. Size <br />` Total Acreage to be permitted: 59 acres <br /> Total Acreage to be disturbed: 44.50 acres <br /> Total Acreage to be reclaimed: 44.50 acres <br /> r <br /> E. Water Requirements <br /> The existing Tracy processing facility uses 781 acre-feet per year of groundwater, or an average <br /> of 2.14 acre-feet per day. The source of water at the existing plant is drawn from two existing <br /> wells located on the property east of the California Aquaduct. The proposed project will not <br /> increase the existing average annual water usage at the processing facility, and it is not <br /> anticipated that additional water will be drawn from the proposed site. <br /> F. Contaminants <br /> Petroleum products used to fuel and maintain on-site earthmoving and conveying equipment <br /> will be handled in compliance with all applicable laws and regulations regarding hazardous <br /> materials. Fuels and lubricants will not be stored on-site. In addition regular maintenance of <br /> the earthmoving equipment will occur at existing maintenance sites not located on site. <br /> G. Waste Water <br /> t <br /> f No wastewater will be generated on this project site. <br /> H. Water Impoundments and Diversions <br /> There will be no impoundments or diversions on this project site. <br /> I. Ore Processing <br /> No material processing will occur on-site. All material will be processed at the Tracy <br /> processing facility east of the California Aqueduct and as described previously. <br /> 0 <br /> 0 <br /> 6 <br /> i <br />