Laserfiche WebLink
k 3 <br /> III. Description of Proposed Reclamation <br /> A. Subsequent Use <br /> Following completion of mining activities this site will be used for open space and grazing <br /> activities. <br /> The following signatures indicates the landowners have been notified, and approve, of the <br /> prop e r cation plan: <br /> By: $ 7/ ru Date: OZ <br /> Richard Kose, <br /> U - � <br /> BY: e q4}„h?W ,,, Date: <br /> �. <br /> Vir o ma L. Ro <br /> By: ' Date: 8 Q� <br /> Joseph <br /> By: rev c Date: d <br /> Russel T./ R se <br /> By: d r#0 e v Date: <br /> David J.R se <br /> B. Reclamation Schedule <br /> Table 2: Reclamation Time Schedule <br /> Phase Disturbed Active Disturbance Reclamation Final <br /> Ac. (Est.) Initiated Reclamation <br /> (Est.) (Est.) <br /> 1 10.22 2006 2007 2010 <br /> 2 11.10 2007 2008 2010 <br /> 3 10.22 2008 2009 2010 <br /> 4 10.36 2009 2010 2010 <br /> Total 41.91 Estimated Completion 2010 <br /> Please refer to Figures 3 and 5 for maps indicating phases of reclamation. Reclamation will be <br /> initiated in each phase following completion of active mining, but will not be completed until <br /> year 5. Following completion of mining activities in each phase, the slopes associated that <br /> phase will be fully reclaimed:The pit floor will remain unreclaimed until mining is completed, <br /> as this will allow for overburden material to be placed back into the excavation. Following final <br /> 7 <br /> I <br />