Laserfiche WebLink
_ v <br /> completion of mining activities a final drainage grade will be constructed on the excavation <br /> floor and the stockpiled topsoil will be replaced. This activity will not be completed until year <br /> five. ` <br /> C. Post Mining Topography <br /> Please refer to Figures 5 and G for proposed post-reclamation topography and cross-sections. <br /> Slopes will be stabilized through vegetation as indicated. <br /> D. Impoundments <br /> No impoundments will be located at this project site. <br /> E. Drainage <br /> All drainage will be contained on-site. <br /> F. Disposition of Old Equipment <br /> All equipment and facilities will be removed from this site following completion of mining <br /> activities. <br /> G. Reveg etation <br /> I <br /> Approximately 114,000 CY of topsoil exists on the site and will be stockpiled as indicated in <br /> Figure 3. Following completion of mining activities this material will be reapplied to the post- <br /> mining surface using scrappers, at an approximate depth of 2 feet. The final surface will then <br /> be vegetated with pre-existing graze land grasses. <br /> I. Future Mining <br /> There will be no future mining on the proposed site following reclamation. <br /> E J. Public Safety <br /> E <br /> The perimeter of the site is currently fenced and will be posted with "No Trespassing" signs. <br /> Gates are secure by heavy chains and pad locks. Access will be restricted to authorized <br /> personnel only. All operations will be monitored for compliance with all OSHA and MSTIA. <br /> Regulations by Granite supervisors and the Safety Manager. <br /> R <br /> 8 <br />