My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004097
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
32003
>
2600 - Land Use Program
>
PA-0200377
>
SU0004097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 10:42:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004097
FACILITY_NAME
PA-0200377
STREET_NUMBER
32003
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
32003 S TRACY BLVD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\APPL.PDF \MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\CDD OK.PDF \MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Provide a planting plan — Please refer to the attached letter from Selby's <br /> Soil for specifics regarding the planting plan. It is anticipated that this <br /> hydroseeding will occur in the early fall, prior to the fall rains. The site <br /> will be seeding in accordance with the reclamation sequence described in <br /> the Reclamation schedule included in the permit application. Once seeded, <br /> the area will be periodically watered to maintain moisture until the first <br /> rains. This mixture tends to germinate quickly and will not likely require <br /> protection from predetation. In addition this area will be used for grazing <br /> following mining and the mix will provide appropriate grazeland plants. <br /> ■ Attachements <br /> • Letter from Selby's Soil <br /> • Map indicating hydroseeding locations <br /> • Monitoring and Maintenance <br /> To ensure the proposed reclamation is successful, the following monitoring <br /> schedule will be followed. For a maximum of two years, at a rate of once <br /> every six months, the site will be inspected to verify the reclamation is <br /> appropriate for the post-mining land use of grazeland. At the completion of <br /> the two year monitoring program, an as-built will be completed and submitted <br /> as required. If it is found that at the end of the two year period additional <br /> monitoring is required, the inspections will continue every six months until it <br /> is deemed that the vegetation is sufficient by a certified biologist. Granite <br /> Construction Company will continue to be responsible for the monitoring and <br /> upkeep of the property until such time as the reclamation is deemed complete. <br /> These reclamation activities will be monitored through the annual SMARA <br /> inspections, as required. <br /> • Public Safety <br /> The site will be fenced with a 10-foot chainlink fence prior to commencement <br /> 4 <br /> of mining activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.