My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004097
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
32003
>
2600 - Land Use Program
>
PA-0200377
>
SU0004097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 10:42:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004097
FACILITY_NAME
PA-0200377
STREET_NUMBER
32003
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
32003 S TRACY BLVD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\APPL.PDF \MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\CDD OK.PDF \MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Land Use <br /> The project site is currently used as rangeland for grazing of sheep. <br /> • Mining Plan <br /> o Topsoil <br /> The topsoil stockpiles will be hydroseeded in the same manner as <br /> described in the attached planting plan. <br /> o Mine Wastes <br /> No wastes will be created on this project site as no processing will take <br /> place here. The only activity that will take place directly on this site is <br /> the extraction of sand and gravel. <br /> • Wastewater <br /> No wastewater is generated on-site as there will be no material processing on- <br /> site. Material is transported to the processing plant as described in the <br /> Proposed Mining Operations portions of the permit application. In addition <br /> portable toilets will be provided for employees. <br /> • Post-Mining Topography <br /> The post-mining topography will be hydroseeded with the same plantings as <br /> indicated in the panting plan included below. <br /> • Revegetation <br /> o What tests will be run to determine whether soil or mine wastes need soil <br /> amendments to promote the support of plant growth—The material on this <br /> site is similar in composition to that located on the adjacent mining <br /> properties. Based on experience with plant growth on these other <br /> properties,this hydroseed mixture tends to germinate and grow quickly. <br /> a What methods are going to be used to protect redistributed topsoil from <br /> wind and water erosion before and after seeding a planting—The exposed <br /> redistributed topsoil will be hydroseeded to protect from wind and water <br /> erosion. If necessary haybales or other similar erosion control devices will <br /> be placed on the slopes until seeding can take place. In addition, until it <br /> begins to rain and the hydroseeding takes root, the area will be watered by <br /> a water truck to ensure Aust suppression. <br /> o What types and amounts of fertilizers, mulch, soil stabilizers, lome or <br /> other materials will be used in revegetation and indicate when they will be <br /> applied-- As indicated in the attached hydroseed mixture, as provided by <br /> Selby's Soil, a mulch, fertilizer, and stabilizing emulsion will be applied in <br /> conjunction with hydroseeding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.