My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007293
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
5320
>
2600 - Land Use Program
>
PA-0800215
>
SU0007293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:58 AM
Creation date
9/9/2019 10:46:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007293
PE
2631
FACILITY_NAME
PA-0800215
STREET_NUMBER
5320
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09110007
ENTERED_DATE
7/25/2008 12:00:00 AM
SITE_LOCATION
5320 N TULLY RD
RECEIVED_DATE
7/22/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TULLY\5320\PA-0800215\SU0007293\APPL.PDF \MIGRATIONS\T\TULLY\5320\PA-0800215\SU0007293\CDD OK.PDF \MIGRATIONS\T\TULLY\5320\PA-0800215\SU0007293\EH COND.PDF \MIGRATIONS\T\TULLY\5320\PA-0800215\SU0007293\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-0800215 <br /> Beck <br /> Site Approval Application No. PA-0800215 was approved by the San Joaquin County Community <br /> Development Department on September 30, 2008. The effective date of approval is October 10, <br /> 2008. This approval will expire on April 11, 2010, which is 18 months from the effective date of <br /> approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary building <br /> permits have been secured and remain in force, and (3) all necessary permits from other agencies <br /> have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Mo Hatef[209] 468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on- <br /> site parking, landscaping, signs, existing and proposed utility services, and grading (refer to the <br /> "SITE PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development <br /> Title Section 9-884) <br /> b. APPROVED USE: This approval is for a twenty (20) foot extension to an existing 133 foot <br /> communications tower with the addition of six (6) panel antennas and an addition of <br /> communications support equipment, as shown on the Site Plan dated July 11, 2008. The new <br /> tower will have a maximum tower height of 153 feet (Use type: Communications Services, Type <br /> II). <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. SETBACKS: New freestanding support structures shall be located a distance equal to at least <br /> the height of the said structure from residential structures on adjoining properties. (Development <br /> Title Section 9-1065.4[d]) <br /> e. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting <br /> equipment associated with wireless telecommunication shall be maintained in good condition by <br /> the provider of the telecommunication facility and, whenever necessary, repaired or replaced. <br /> (Development Title Section 9-1065.7) <br /> f. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities <br /> and the site restored to its pre-construction state if said facilities have not been operational or <br /> used for a period of six (6) consecutive months. Removal and site restoration shall be completed <br /> within ninety (90) days of the end of said six (6) month period. (Development Title Section 9- <br /> 1065.8) <br /> Conditions of Approval - 1 - PA-0800215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.