Laserfiche WebLink
.. Wastewater Treatment System �..r FALL CREEK <br /> Specifications ENGINEERING,INC. <br /> 1. SCOPE OF WORK <br /> s <br /> %W The proposed project will involve the following construction activities: <br /> `r 1. Clearing, grubbing and rough grading. <br /> 2. Earthen grading of the proposed treatment wetland including the berm around the <br /> wetland, regrade the existing stormwater detention area. <br /> 3. Constructing wetland inlet, outlet, and overflow structures as shown on the plans. <br /> %W 4. Installing wetland liner including keyways and pipe boots as needed. <br /> `. 5. Installing an effluent pumping system and solid set sprinkler irrigation system to <br /> distribute treated water to the irrigation area. <br /> 6. The contractor will be responsible for implementing material, vehicle and waste <br /> %W management measures to maintain excavated inert and potentially hazardous materials <br /> outside of the treatment and disposal areas. The contractor will also be required to <br /> ` maintain a material storage, spill prevention and staging area. <br /> 7. Anticipated best management practices for construction activities will include: <br /> * schedule limits through April 30 through October 15 <br /> * measures to stabilize cleared and grubbed areas <br /> 8. Recommended BMPs will be consistent with the California Storm Water Best <br /> Management Practice Handbook for construction activities and/or other requirements <br /> established by San Joaquin County. <br /> 2. PARABOLIC SCREEN <br /> 1. The manufacturer shall size the screen the to handle at least 35 gallons per minute of <br /> %W winery process wastewater. <br /> %W 2. Screen slot openings shall be 0.010". <br /> 3. The screen shall be of 63 wire construction with 5/32" round support rod @ 1'/z" spacing. <br /> 4. The screen housing, headbox, and damper shall be constructed from 11 gauge, 204 <br /> stainless steel plate. <br /> 5. The screen shall be piped for gravity flow and shall have an inlet and outlet. <br /> ;. 6. Operation and Maintenance instructions shall be included. <br /> 7. The screen shall be IPEC Model SHS 1822 Mini Sidehill Screen, or equivalent. <br /> ' 3. SEPTIC WANK <br /> The accompanied plans present the general layout, plumbing configuration and construction <br /> details for the septic system. The following are material specifications for the system <br /> ' components. All materials used for the construction of this project shall conform to the <br /> following specifications or as described in the accompanied plans. <br /> 3.1. Concrete influent tank <br /> 1. The 5,000 gallon influent tank, located between the parabolic screen and the wetland, <br /> shall be constructed of concrete, as approved by the county of San Joaquin. <br /> 2. The septic tank shall have at least two compartments separated by a baffle or equivalent <br /> arrangement. The septic tank shall be watertight. Such as Jensen Model No. JZ-5,000 <br /> commercial septic tank, or equivalent. <br /> JESSIE's GROVE WINERY 26 MAY 2002 <br />