Laserfiche WebLink
.. Wastewater Treatment System Now, + FALL CREEK <br /> Specifications ENGINEERING,INC. <br /> 3. The septic tank shall be constructed with two 20-inch diameter manholes. The first <br /> manhole located close to the tank inlet and the second manhole centered over the second <br /> �- chamber of the tank. <br /> 3.2. Pump vault <br /> 1. The 1,500-gallon pump vault, located after the wetland and before the disposal fields, <br /> shall be constructed of concrete, as approved by the County of San Joaquin. <br /> 2. The pump tank shall be watertight and shall be unbaffled consisting of only have one <br /> compartment. <br /> 3. The pump tank shall be constructed with at least one 20-inch diameter manhole and an <br /> access door. The manhole shall have a watertight riser to grade finish. The manhole <br /> located close to the tank inlet and the access door located close to the outlet of the tank. <br /> 4. EARTHEN BERM <br /> `► 4.1. Materials <br /> %, Materials to construct the berm shall consist of the following: soil material shall consist of the <br /> material existing in the area, of approved borrow material, or of a combination of these materials <br /> proportioned as directed by the engineer. The soil shall be free from vegetation, roots, or other <br /> %' objectionable matter, and shall not contain aggregate or stone larger than 2 inches. <br /> 4.2. Equipment <br /> Any combination of machines or equipment that are in good safe working condition that will <br /> produce the required results may be used upon approval of the engineer. Equipment necessary <br /> %W for the proper execution of the work shall be on the project and have been approved by the <br /> *AW engineer prior to its use in the construction operations. The machines and equipment shall be <br /> maintained in a satisfactory operating condition at all times during use. Leakage of water, oil, <br /> grease, or other objectionable material shall be corrected promptly or the engineer may order <br /> such equipment removed from the work and replaced with satisfactory equipment. <br /> 5. WETLAND LINER <br /> 5.1. Scope <br /> %W The work contained in these specifications consists of furnishing and installing PVC lining as <br /> �• shown on the drawings or directed by the project engineer. All work shall be done in strict <br /> accordance with the drawings and these specifications and subject to the terms and conditions of <br /> the contract. It is the intent of these specifications to ensure that a first quality finished product is <br /> provided. <br /> 5.2. Description Of Materials <br /> PVC lining shall consist of sheets of manufactured PVC fabricated into large panels by Colorado <br /> Lining International, or equivalent. <br /> `. The materials supplied under these specifications shall be manufactured specifically for the <br /> purposes of this type of work. The liner shall be covered after placement. <br /> JESSIE's GROVE WINERY 27 MAY 2002 <br />