Laserfiche WebLink
Wastewater Treatment System ++ FALL CREEK <br /> Specifications ��./�, ENGINEERING,INC. <br /> The contractor shall install control panels and related equipment to control the pump installed in <br /> the transfer tank. <br /> Control wiring between the splice box and the control panel may be housed in conduit or direct <br /> buried using a suitable direct-burial wire and burial depths. All conduit shall be sch.40 PVC. <br /> All equipment and switch panels shall be interconnected with rain tight flexible conduit and <br /> %W junction boxes. All electrical receptacles shall be suitable for outdoor exposure. All control <br /> b panels, service panel and switches shall be enclosed in watertight NEMA enclosures. <br /> The number and size of wires should be as specified by the manufacturers or the National <br /> �" Electric Code (NEC). Control wiring shall be suitably color coded as necessary for <br /> `► identification. All common wire shall be the same color. All splices made in the splice box <br /> should be done using waterproof wire nuts or butt connectors and heat shrink tubing. Splices in <br /> the control wire shall be made in accordance with the requirements for service wire. At least 2 <br /> feet of slack shall be left in each splice and point of connection in control boxes. <br /> ,.. All wiring shall be tested for continuity, open circuits and unintentional ground prior to <br /> `„ connecting equipment. <br /> %W' Upon completion of the work, the control system shall be in operating condition with an <br /> operational chart mounted within the controller cabinet. The operational chart shall provide float <br /> %W and pump wiring instructions and information regarding the intended function of each <br /> ,y component. All control systems shall also contain the proper electrical warnings and <br /> instructional information to ensure user awareness and safety. <br /> r. <br /> 1%. <br /> .. <br /> r.. <br /> r.. <br /> �. <br /> JESSIE's GROVE WINERY 36 MAY 2002 <br /> L <br />