Laserfiche WebLink
MONITORING WELL INSTALLATION WORK PLAN <br /> WKA No. 5279.02 <br /> January 30,2004 <br /> Page 6 <br /> details, a description of methods used, analytical results, and a discussion of <br /> findings. <br /> Time Line <br /> Following approval of this Work Plan by the RWQCB and receipt of authorization to proceed from <br /> Canandaigua Wines,permitting and scheduling of field work would begin within one week. We <br /> anticipate that fieldwork would commence within two to three weeks following approval of <br /> monitoring well permits. We would provide a Monitoring Well Installation Report within four <br /> weeks after completion of the fieldwork. <br /> Should you have questions about this Work Plan, please do not hesitate to contact us. <br /> Wallace-Kuhl&Associates,Inc. ��\StERED GfO�Oc/ <br /> Q JOHN C. <br /> PFEIFFER <br /> Cffer, No.6984 <br /> ¢¢ P(`�� F cie Le lercq John C. Pfei .G. Of CALIF <br /> Staff Geologist Project Geologist <br /> DMLUCP\kjm <br /> Copies to: <br /> Mr. Tim O'Brien, Central Valley RWQCB <br /> Mr. Mike Huggins, San Joaquin County Env. Health <br /> 5279.02-Well Installation WP <br /> INK <br /> WALLACE•KUHL <br /> - Er ASSOCIATES INC. <br />