Laserfiche WebLink
• Schedule for connection to City water and wastewater lines and the cost and <br /> payment of impact fees for said services. <br /> • The dimensions and timing of the dedication of additional right-of-way along on <br /> both Corral Hollow Road and Valpico Road which is necessary for future road <br /> widening in accordance with the City's Roadway Master Plan. <br /> • The extent and timing of street frontage and intersection improvements on Corral <br /> Hollow Road and Valpico Road, left turn pockets on Corral Hollow Road and <br /> Valpico Road, and the exact location of curb cuts at the entrances to the <br /> proposed development. <br /> • Timing of the connection to the City storm drainage system and payment of <br /> storm drainage impact fees. <br /> If you have any questions, please feel free to give me a call at (209) 831-4600. <br /> Sincerely, <br /> 0� y;�/ <br /> Bill Reeds <br /> Development and Engineering Services Director <br /> cc: Julie Yuan-Miu, Assistant City Manager <br /> Kul Sharma, City Engineer <br /> Bill Dean, Planning Manager <br /> Mike Souza, Souza Real Estate and Development <br />