Laserfiche WebLink
TABLE OF CONTENTS <br /> FFLINTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> H. SOIL SUITABILITY STUDY FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . .. 2 <br /> A. SUBJECT PROPERTY AND SURROUNDING STUDY AREA INFORMATION . 2 <br /> B. SOIL PHYSICAL CHARACTERISTICS AND ANALYTICAL TEST RESULTS . . . 3 <br /> C. PERCOLATION TEST RESULTS . . . . . ... .. . . . . . . . . . . . . . . . . . . . .. . .. . . . . . . . . 5 <br /> D. GROUNDWATER INFORMATION . .. . . . . . . . . . . . . . . .. .. .. . . . .. .. . . . . . . . . . . 7 <br /> CALCULATION OF ALKALINITY REQUIREMENTS FOR NITRIFICATION <br /> MOUNDING ANALYSIS <br /> E. SURFACE WATER INFORMATION .. . . .. . . . . . . . . . . . . .. .. . . . . . .. . . .. . . . . .. 8 <br /> CLIMATIC DATA:RAINFALL VERSUS EVAPOTRANSPIRATION <br /> III. NITRATE LOADING STUDY FINDINGS . .. . . . . . . .. .. . . . . . . . . . . . . . . . . . . . ... . . . . 9 <br /> A. WASTEWATER FLOW PROJECTIONS AND CHARACTERISTICS . . .. . . . . . . . 9 <br /> WASTEWATER FLOW VOLUME PROJECTIONS <br /> COMMERCIAL WASTEWATER CHARACTERISTICS <br /> B. CALCULATED NITRATE-NITROGEN LOADING . . . . . . .. . . .. . . . . . . . .. . . . . . 11 <br /> C. SEPTIC SYSTEM OPERATIONAL PARAMETERS AND COMPONENTS OVERVIEW . 12 <br /> GREASE TRAP INTERCEPTOR TANKS AND CONVENTIONAL SEPTIC TANKS <br /> PRESSURIZED FILTER BED SIZING CALCULATIONS <br /> FILTER BED DESIGN AND OPERATIONAL SPECIFICATIONS <br /> IV. CONCLUSIONS AND RECOMMENDATIONS . . . . . . . . . . . . . . . . . . .. . . . . .. . . . . .. 15 <br /> RECOMMENDATIONS AND MAINTENANCE <br /> V. LIMITATIONS . . . . .. . . .. . . . . . . . . . . . ... . . . . .. . . . .. . . . . . . . . . . . . . . .. . .. . . .. . . . . 18 <br /> VI. REFERENCES . . . . . . . . . . . . . . . . . .. . . . . . .. . . . . .. . . . . . . . . . . . . . . . . . . . . .. . .. . . . . . . 19 <br /> VII. APPENDICES . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. . . . . . . . . . . .. .. .. . . . .. . . .. . . . .. 20 <br /> APPENDIX A: SITE PLAN AND S.C.J.PARCEL VIEWER MAPS(SSS§ 1.3,1.4) <br /> APPENDIX B: SOIL CHEMICAL ANALYSES WITH CHAIN OF CUSTODY FORMS(SSS§4.6) <br /> APPENDIX C: PERCOLATION TEST LOCATIONS AND RESULTS,WITH LOGS OF BORING(SSS§5.1,6.1.6.6) <br /> APPENDIX D: QUICK 4T STANDARD INFILTRATOR CHAMBER®SPECIFICATIONS <br /> APPENDIX E: ORENCO PUMP CURVES AND DATA <br /> APPENDIX F: SURROUNDING SEPTIC SYSTEM REPAIR PERMITS AND WELL LOGS <br /> APPENDIX G: PHOTOGRAPHIC PLATES <br /> Chesney Consulting <br />