My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006059 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
12100
>
2600 - Land Use Program
>
PA-0600207
>
SU0006059 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:04 AM
Creation date
9/9/2019 10:54:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006059
PE
2627
FACILITY_NAME
PA-0600207
STREET_NUMBER
12100
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24014024
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
12100 W VALPICO RD
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\12100\PA-0600207\SU0006059\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ONVENTIONAL SEPTIC TANKS AND GREASE TRAP INTERCEPTOR TANK <br /> ptic tanks store the accumulated sludge, scum and effluent(clear zone)volumes, which in turn <br /> fect treatment of nitrogen within the tanks. In the following calculation,the pump-out interval <br /> ctor times the QAVE times the peaking factor(PF) correlate the pump-out time interval in years with <br /> the recommended tank capacity. The peaking factor value for this project is estimated to be 4.5: <br /> PF=peak average flpwrate(Based on FM e,iW;at= 800 x 10 = 8,000 gpd =4.5 <br /> Average flowrate 1,775 gpd <br /> Septic Tank Capacity Based on Pump-out Interval of One Year: <br /> Recommended tank capacity for a potential pump-out interval of one year: <br /> 1.0(pump-out interval factor)(QAVE) x Peaking Factor(PF=4.5) = 1.0(1,775 gals/day) x 4.5 =7,988 gals <br /> Septic Tank Capacity: Restroom southwest of Kitchen =one - 1,200 gallons = 1,200 gallons <br /> Septic Tank Capacity: Men's and Women's Restrooms =three- 2,000 gallon tanks=6,000 gallons <br /> Interceptor Grease Tank Capacity: Kitchen =one - 2.000 gallon tanks = 2,000 gallons <br /> Total Tank Capacity = 9,200 gallons <br /> Detention Time: <br /> Detention Time=9,200 gal total tank capacity x 0.85 (15%volume lost to sludge/scum accumulation(d.,.i <br /> 4.5 (Peaking factor)x 1,775 gals/day(ADF) <br /> Detention Time= 1.0 days. The minimum acceptable detention time is 1.0 day. <br /> PRESSURIZED FILTER BED SIZING CALCULATIONS <br /> Base Tank Capacity= 1,200 gal. <br /> However, ADF= 1,775 gpd, therefore Calculated Tank Capacity must be determined: <br /> Calculated Tank Capacity(CTC)= 1,125 +(1,775 (ADF)x 0.75)=2,456 gallons <br /> Leachline Equivalent Requirement=(1,200 gallons BTC+2,456 ADF Clay Loam Soil Factor(SF) <br /> = 823 lineal feet of leachline (LFLL). 823 x 3.5 (Clay Loam Soil- ter Bed So' Factor)_ <br /> 2,880 sq. ft. filter bed area re uired per EHD calculations —3 330 s . specified <br /> Each Filter Bed: 5 Infiltrator Chambers wide x (2.83 ft+ 0.5 ft = <br /> 3.33 ft width/chamber x 5 = 16.67 ft N-S x 2 (2 Filter Beds)=33.3 ft wide N-S <br /> 25 Infiltrator Chambers long=4.0 ft effec chamber x 25 Chambers= 100 ft long E-W <br /> Proposed Filter Bed Area(Single Bed) 7 ft N- ide x 100.0 feet E-W length= <br /> 1,667 sq. ft. 1,667 sq. ft. x 2 Filter Bed =3 30 sq. f Filter Bed to be installed: <br /> Total Number of Chambers Required= 5 ers width x 25 Chambers length= <br /> 125 Chambers x 2 Filter Beds=250 Quick 4TM Standard hifiltrator Chambers required. <br /> Page -13- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.