My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006059 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
12100
>
2600 - Land Use Program
>
PA-0600207
>
SU0006059 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:04 AM
Creation date
9/9/2019 10:54:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006059
PE
2627
FACILITY_NAME
PA-0600207
STREET_NUMBER
12100
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24014024
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
12100 W VALPICO RD
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\12100\PA-0600207\SU0006059\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F7(both <br /> e Replacement Area: The area directly adjacent to the south of the primary filter <br /> enoted as the replacement/reserve area. This area consists of the primary filter bed j <br /> r beds) of 3,330 sq. ft, as illustrated on the Site Plans. Piping maybe stubbed-outary filter bed to this reserve area in the event this area must be activated before City <br /> r arrives to the project site. <br /> FILTER BED DESIGN AND OPERATIONAL SPECIFICATIONS <br /> Pump Chamber to Filter Bed(Subject to Change): The third(northernmost tank), 2,000 gallon <br /> septic tank northwest of the restrooms is the pump chamber for pressurizing the filter beds. A <br /> Duplex Pump System is encased in an Orenco BioTube® filter pump vault to pump the effluent <br /> through a 2.00 inch PVC transport line. <br /> One Orenco BioTube® Filter Pump Vault PN: PVU68-2425L with Duplex Effluent Pump's <br /> System: PN: 501012, 1 HP, 50 gpm, single phase 230 Volt contained with BioTube Pump Vault. <br /> Total effluent volume can be verified by checking pump cycle times on the panel to ensure both <br /> pumps distributed effluent equally. See pump curves in Appendix E. <br /> MVP Duplex Panel PN: MVPDAX2ROCSSA,with current sensor <br /> An anti-siphon assembly(Model HVAS 125) must be used if pumping proceeds downhill. <br /> Laterals for Each Filter Bed: Sch C 1.5"nominal diameter, 1/8" orifice directed at 12 o'clock,4.0 ft <br /> spacing, 100 ft long. "Tum-ups he ends of each lateral for clean-out contained within valve cover boxes. <br /> Orifice Discharge Rate: 1/8" with 5 ft residual head=0.43 gpm <br /> 100 ft=4.0 ft=25 orifices/lateral x 0.43 gpm/orifice= 10.75 gpm/lateral <br /> Network Diso�arge Rate (NDR)For Each Filter Bed= 5 laterals x 10.75 gpm/lateral= 53.7 gpm <br /> Transport Line Size=2.0" Sch. 40 PVC <br /> Manifold for Each Filth Bed= 1.5" Sch. 40 PVC <br /> Total Dose Volume (TDV)From Each Pump: <br /> 0.092 gals/ft x 100.0 ft x 5 laterals=46 gals x 5 times lateral void volume=230 gals <br /> 1.5" x 17 ft manifold=0.092 gals/ft x 17 ft=2 gals <br /> Transport line= 2" =0.163 gals/ft x -50 ft= 8 gals <br /> 230+2+ 8=240 gals/dose-53.7 gpm=4.5 min/dose <br /> 1,775 gpd ADF-240 gals/dose=7.4 doses/24 hr period/each pump <br /> Infiltrator Specifications: / <br /> See Appendix F. Quick 4TM Standard Infiltrator Chamber. Due to clayey/silty soil structure at soil-effluent <br /> interface, a 2.5 inch layer of!2J washed sand must be laid down over a !p owed soil surface before <br /> installation of chambers. This will prevent"silt-over"or siltation of the interface that may be caused by a <br /> portion of the pressurized effluent splashing down onto the native soil surface. Siltation would cause a <br /> significant reduction in infiltration and percolation. Volume of sand required: <br /> 3,330 sq. ft of filter bed x(2.5inches x(1+12))=694 ft',or 26 yds' <br /> g / <br /> Monitorinof Each Filter 13ed: Monitoring of effluent with four monitoring ports or wells within,or on <br /> the perimeter of each filter bed area. Observation tubes: 4"PVC Tee at soil/effluent interface with 4" riser <br /> extending above the soil/grass surface by at least 0.5 foot, with a screw type cap. <br /> Page -14- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.