Laserfiche WebLink
deferred upon execution by the owner of a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to the estimated construction costs prior to approval of the <br /> Improvement Plan. A$740.00 fee currently is required for processing, per Development Title Table <br /> 9-240.2, in addition to a copy of the Grant Deed and an Estimate for the required frontage <br /> improvements. The estimate shall be prepared by a registered civil engineer with a typical section <br /> drawing on a form to be supplied by Public Works for approval. As an option, Public Works will <br /> prepare the drawing and estimate for an additional fee of$315.00. The fee due will be based on <br /> the current fee schedule. (Development Title Section 0-1150.2) <br /> f. The frontage improvements consisting of curb, gutter, sidewalk, and 8 feet of pavement for Valpico <br /> Road shall be constructed in conformance with the standards for one-half of an 84-foot-wide right- <br /> of-way minor arterial street. The construction of the frontage improvements will be deferred upon <br /> execution by the owner of a Secured Deferred Frontage and Roadway Improvement Agreement <br /> with a deposit equivalent to the estimated construction costs prior to approval of the Improvement <br /> Plan. A $740.00 fee currently is required for processing, per Development Title Table 9-2402, in <br /> addition to a copy of the Grant Deed and an estimate for the required frontage improvements. The <br /> estimate shall be prepared by a registered civil engineer with a typical section drawing on a form <br /> to be supplied by Public Works for approval. As an option, Public Works will prepare the drawing <br /> and estimate for an additional fee of$315.00.The fee due will be based on the current fee schedule. <br /> (Development Title Section 9-1150.2) <br /> g. The Traffic Impact Mitigation Fee shall be required for this development.The fee is due and payable <br /> at the time of building permit application. The fee ^U ^eRtly is $224.87 per daily t^^ eRd generated <br /> i^ the e-aGyarea. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost index as published by the Engineering News Record. A GFed#for a portion of the <br /> fee may be allewed if it GaR be verified that the exiStirig GhUFGh was in epeFatien 9R or befGFe April <br /> zz 1990 ,. pFevieusly paid Tinny fees (Resolution R-00-433) <br /> h. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee ^,,..^Rtlyis $780.00 per 1,009 gFesr square fee <br /> of building desigriated as The fee shall be automatically adjusted July 1 of each year <br /> by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-06-38) <br /> i. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> j. The aoplicant/developer shall pay their fair share for the following prior to issuance of building <br /> permits for Phase 1 (parish hall): <br /> (1) Cost of signalizing Valpico Road at Corral Hollow Road. The fair share amounts to$86,169.00. <br /> (2) Cost of lane addition at Valpico Road and Corral Hollow Road. The fair share amounts to <br /> $172,339.00. <br /> k. The applicant/developer shall pay their fair share for the following prior to issuance of building <br /> permits for Phase 2 (church): <br /> (1) Cost of signalizing Schulte Road at Corral Hollow Road. The fair share amounts to$94,637.00. <br /> (2) Cost of signalizing Valpico Road at Tracy Boulevard. The fair share amounts to$110,587.00. <br /> (3) Cost of lane addition at Valpico Road and Tracy Boulevard. The fair share amounts to <br /> $73,725.00. <br /> I. The applicant/developer shall pay their fair share for the following prior to issuance of building <br /> permits for Phase 2 (school): <br /> PA-0600207 (RAA) (UP) Revised Conditions of Approval <br />