My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009928
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERIGAN
>
5741 (2)
>
2600 - Land Use Program
>
PA-1400011
>
SU0009928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:18 AM
Creation date
9/9/2019 10:57:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009928
PE
2631
FACILITY_NAME
PA-1400011
STREET_NUMBER
5741
Direction
E
STREET_NAME
VERIGIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
ENTERED_DATE
2/4/2014 12:00:00 AM
SITE_LOCATION
5741 E VERIGIN RD
RECEIVED_DATE
2/3/2014 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VERIGIN\5741\PA-1400011\SU0009928\APPL.PDF \MIGRATIONS\V\VERIGIN\5741\PA-1400011\SU0009928\CDD OK.PDF \MIGRATIONS\V\VERIGIN\5741\PA-1400011\SU0009928\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJCOG, Inc . <br /> 04 S JC0G,Inc. <br /> San Joaquin County Multi-Spades Habitat Contesnation 6 Open Spare Plan <br /> 555 East Weber Avenue•Stockton,CA 95202• (209)235-0600 a FAX(209)235-0435 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br /> Department, Engineering Department, Survey Department,Transportation Department, <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and most be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITNIMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the 1TMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> + fust,the project applicant most <br /> I a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> a Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-1400011 (SA) <br /> 1 <br /> t Landowner: Mohammad&Parveen Khan Applicant: Mohammad& Parveen Khan <br /> �( Assessor Parcel#s: 197-120-02 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: Stephanie Stowers <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.