Laserfiche WebLink
pipeline without approved bridging, said bridging to be <br /> approved between S.S.J. I.D. and the contractor. <br /> 6. No trees and/or rubbish will be disposed of or stored on <br /> the S.S.J. I.D. easement or facilities. <br /> 7 . S.S.J. I. D. will be notified 48 hours in advance of any <br /> excavation work. <br /> 8 . The landowner ) agrees that the existing pipeline or <br /> concrete lined canal do not presently leak and agrees <br /> that any damage will be repaired at landowner's expense. <br /> 9 . It is understood by the applicant that the District shall <br /> not be held responsible to remedy high water table <br /> problems created by the excavation. <br /> 10. Landowner shall provide District with sufficient fill <br /> dirt from excavation for protection of canal or pipeline <br /> and place fill dirt as directed by District Engineering <br /> Department. <br /> 11. Any irrigation service structure (District or Private) <br /> modification or installation necessitated by the proposed <br /> excavation shall be performed at the landowner's expense. <br /> Furthermore, owner shall obtain a Structure Permit from <br /> the District prior to installing, modifying, or removing <br /> any irrigation structures on District facilities. <br /> In conclusion, I would like to reiterate that these requirements <br /> are based upon previously approved standards that were generally <br /> considered acceptable in the past and should not be construed as <br /> being all-inclusive. Each and every item is still subject to <br /> review and approval or disapproval by the District's Board of <br /> Directors. <br /> If there are any questions, please feel free to contact Sam Bologna <br /> or myself at (209) 823=3101. <br /> Sincerely yours, <br /> Rick Barzani <br /> Engineering Dept. Head <br /> cc: Sam Bologna <br /> ENGR-A: \DEVELOP\EXCAVATE.BLK <br /> 01/21/93 <br /> 2 <br />