Laserfiche WebLink
II, DESCRIPTION OF PROPOSED MINING OPERATION. <br /> ❑ A. Map of Operations:On a map,show details of the proposed mining.operation including the following applicable features: <br /> See attached Agricultural Grading Excavation.Plans. <br /> propertylpermit boundaries topsoil- ore stockpile`areas <br /> stockpile areas .-tailings ponds <br /> siltation ponds buildings <br /> leach pads pits (slope crest/toe and benches) <br /> haul roads <br /> waste/overburden dumps processing facilities <br /> hazardous materials storage areas other pertinent features <br /> B. Production Schedule: Provide a table of estimated annual production of ore/product and overburden/waste. If mining <br /> will be phased, specify quantities by phase. The annual estimated quantities should be'summed to give the total <br /> anticipated production for the life of the mine. <br /> This proposed project will be completed in two phases'"shown on the Grading Plan.The excavated material <br /> will be stockpiled as show.n on-Grading Plan. <br /> I ❑ C. Mining Plan:A description of how mining will be done;including any or all of the following: <br /> ® 1.. Operating Plan: Provide the proposed initiation and termination dates of the.mining operation. if seasonal, <br /> provide the proposed annual months of operation. <br /> Phase i of the proposed project will be started upon approval of the application and completed by <br /> January 2008 so that strawberries can be planted.in the spring of 2068. Phase II will be completed by <br /> January 2009 <br /> 2: Topsoil: Describe: <br /> ® a. How soil stockpiles will be protected from erosion (e.g. revegetated). <br /> The proposed stockpile will experience minimal erosion. <br /> ® b. Location and volume of proposed soil stockpiles <br /> The stockpile is shown on the.proposed Agricultural Excavation Plan: 98,876+_cubic yards. . <br /> ® c. Stripping and handling techniques... <br /> This is a proposed agricultural grading excavation. <br /> 3. Overburden/Waste/Ore: Describe: ' <br /> ® a. The proposed type of mine(open pit,quarry,placer,dredge,etc.). <br /> Grading excavation <br /> ® b. The type/size of mining/hauling equipment to be used. <br /> One paddle-wheel 623 scraper; one 5-yard front end loader;-one water truck <br /> ® c. The use;handling,"and storage of explosives. <br /> NIA <br /> I ® d. The proposed method for removing overburden and ore. <br /> I4 WIA <br /> Page 5 of 9 2006-20 Ag Ex CheckUst.doc <br />