Laserfiche WebLink
x. <br /> ® e. The maximum anticipated depth of the mine. I <br /> This is a proposed agricultural grading excavation; max cut is 3.7' and max fill is 1.3 <br /> f. The maximum depth of mining, bench width,and maximum slope angles(illustrate with cross sections). <br /> N/A <br /> ® g. If mining will be phased,describe each phase and concurrent reclamation. <br /> Two phases <br /> ® 4, Mine Waste: Most of the concerns relating to the discharge of mine waste can be satisfied by appending a copy <br /> of the report of waste discharge and waste discharge permit to the reclamation plan. <br /> .Two phases <br /> D. •Size: Provide the following information: <br /> ® 1. Total acreage permitted or to be permitted. .«.40.14 ac gross <br /> 2. Total acreage to be disturbed. 36.45 ac . <br /> ® 3. Total acreage to be reclaimed. r 36.45 ac <br /> E.. Water Requirements: <br /> ® 1. Estimate of daily and annual water requirements. 500 gal <br /> ® 2. Identify the sources and uses of water WeiI water <br /> F. . Contaminants: <br /> ® 1. Identify potential contaminants and describe how they will be controlled or disposed. <br /> NIA <br /> ® 2. Describe how imported wastes such as domestic garbage,chemicals,oil,or other materials will be disposed of. <br /> There will be no imported wastes with this proposed project. <br /> G. .Waste Water: Discuss: <br /> ® 1. How wastewater will..be contained or disposed of. <br /> There will be no waste water. <br /> H. Ore Processing: <br /> ® 1. Describe the proposed method and equipment for processing ore(e.g:.,dry screening,flotation,leaching,etc.). <br /> NIA <br /> ® 2. `Estimate minimum and maximum capacity(input and output)of the mill/processing facility. <br /> NIA <br /> ® 3. Provide the estimated life of the processing operation(if different from mine life) <br /> NIA <br /> Page 6 of 9 '2006-20 Ag Ex Checklist.doc <br />