My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006749
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERITAS
>
8844
>
2600 - Land Use Program
>
PA-0700450
>
SU0006749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:42 AM
Creation date
9/9/2019 10:57:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006749
PE
2606
FACILITY_NAME
PA-0700450
STREET_NUMBER
8844
Direction
E
STREET_NAME
VERITAS
STREET_TYPE
AVE
City
MANTECA
APN
22613020
ENTERED_DATE
10/2/2007 12:00:00 AM
SITE_LOCATION
8844 E VERITAS AVE
RECEIVED_DATE
10/1/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\APPL.PDF \MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\CDD OK.PDF \MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> t <br /> . V i <br /> ❑ I. Other Information: <br /> III. DESCRIPTION OF PROPOSED RECLAMATION <br /> A'. Subsequent Uses : <br /> ® 1. , What is the proposed subsequent use for the reclaimed mined land(e.g_recreation,wildlife habitat,grazing,open <br /> space,etc.)? <br /> Initially, strawberries and eventually'almond orchard (see.reclamation plan) <br /> ® 2. Evidence that owner(s)of a possessory interest(including surface rigNts)have been notified of the proposed use or <br /> potential uses after reclamation. <br /> The owner of this property is the applicant.. <br /> B. Reclamation Schedule: <br /> ® 1. Provide a time schedule that will ensure reclamation at the earliest possible.time on those portions of the mined lands <br /> that will not be subject to further disturbance. <br /> Strawberries will be planted during the first 3 years:During the 4t"year the parcel will be planted with an <br /> almond orchard. <br /> ®. 2. Provide a map of the proposed phases of reclamation and:the,corresponding acreage and dates for completion of each <br /> phase. <br /> 3. If reclamation will not be concurrent with mining,explain why. <br /> Strawberries will be planted daring'the first 3-.years. During the 4`h year the parcel will be planted with an <br /> almond orchard. <br /> C. Post Mining T000araohy: <br /> ® 1. Provide a map of proposed post-reclamation,topography;show drainage plan,benches,roads,plantings,and other <br /> pertinent features of the reclamation <br /> See Grading Excavation Plan <br /> ® <br /> .2.. Attach cross sections through slopes,cuts,and fills;show-original ground,post-mining surface,underlying geologic <br /> conditions, and reclaimed surface. <br /> See Cross-Section Plan f . <br /> ;® 3. Describe how slopes will be stabilized to prevent failure sAandslides,earth flows,falling rock,and erosion. <br /> The proposed slopes are.minimal.Erosion-.will be controlled with ground cover. <br /> ® 4. Specify slope design calculations including the-factor of safety. NIA <br /> ® D. Impoundments: Describe how impoundments wiltpe reclaimed (e.g. regarded dewatered,capped,revegetated,-removed, <br /> etc:) <br /> NIA <br /> Page 7 of 9 2406-20 Ag Ex Checklist.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.