Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-462.(SA) <br /> time o building permit applic ion. ( e fee currently is$216.55 per additional daily trip-end generated in <br /> the Tr area. The fee shall matically adjusted July I of each year by the Engineering <br /> Construction as published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. A State National Pollutant Discharge Elimination System(NPDES) Construction Permit Notice of Intent <br /> (NOI) shall be filed with the State Water Resources Control Board if over one (1)acre of total ground is <br /> disturbed. This project must also develop a Construction Storm Water Pollution Prevention Plan <br /> (SWPPP). <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:ar <br /> PAC0Mbffl =SATYR 20051PA-0500462.wpd <br /> I <br />