Laserfiche WebLink
THOMAS R. FLINN P.O. BOX 1810-1810 E.HAZELTON AVENUE <br /> '',, STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR ,L (209)468-3000 FAX(209) 458-2999 <br /> �,4jk0p�`P www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> JAMES F.PAYTON Workkg for YOU <br /> BUSINESS ADMINISTRATOR <br /> MANUEDEPUTY SECOR10 REC-EIe QED <br /> DEPUTY DIRECTOR i^' '1� <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR J;y nf !2 2002 <br /> December 20, 2002 I r d 7 <br /> Communis; Development Dept. <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director. <br /> Community Development Department <br /> CONTACT PERSON: Jose Rubianes <br /> FROM: Ben E. Neely Engineer III fes.L <br /> Public Services Division <br /> SUBJECT: PA-02-550 A MINOR SUBDIVISION APPLICATION TO DIVIDE A 20,452 <br /> SQUARE FOOT PARCEL INTO A 7,410 SQUARE FOOT PARCEL AND TWO <br /> 6,555 SQUARE FOOT PARCELS. LOCATED ON THE NORTH EAST CORNER <br /> OF EAST WASHINGTON STREET AND OLIVE AVENUE. (SUPERVISORIAL <br /> DISTRICT 2) <br /> PROPERTY OWNER: Mathew D. Barberis APPLICANT: Dillon& Murphy <br /> ADDRESS: 4025 E. Washington Street APN: 157-331-10 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> Washington Street has an existing right-of-way width of 60-feet and a planned right-of-way width of <br /> the same. Olive Avenue has an existing right-of-way width of 50-feet and a planned right-of-way <br /> width of the same. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. <br /> The fee is due and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. <br /> (Development Title Section 9-915.2) <br /> 2. The frontage improvements for Washington Street shall be constructed in conformance with <br /> the standards for one-half of a 60-foot right-of-way Collector Residential. The frontage <br /> improvements for Olive Avenue shall be constructed in conformance with the standards for <br /> one-half of a 50-foot right-of-way Local Residential. The construction of the frontage <br />