Laserfiche WebLink
c <br /> Ur S,� <br /> I <br /> r <br /> !i <br /> 2. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $3,979.00 per <br /> 1,000 gross square foot increase in area of building designated as Retail Service or <br /> $176.84 per additional daily trip;end generated in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering Ne'Ws Record. <br /> (Resolutions 00-433) <br /> 3. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. (The fee currently is . <br /> $490.00 per 1,000 gross square foot increase in area of building designated as Retail <br /> Service. The fee shall be automatically increased on January 1 of each year through the <br /> year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-81'8.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met all Solid Waste requirements for Development Projects. Final Site <br /> Plan is required upon submittal of verification. <br /> a <br /> ,Q <br /> GK:BN:sh <br /> II <br /> I� <br /> 9 ' <br /> iIF <br /> I <br /> I <br /> I <br /> I: <br /> i I <br /> I <br /> I <br /> I <br />