My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002439
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
5749
>
2600 - Land Use Program
>
UP-89-23
>
SU0002439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:14 AM
Creation date
9/9/2019 11:02:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002439
PE
2626
FACILITY_NAME
UP-89-23
STREET_NUMBER
5749
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
5749 E WATERLOO RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\5749\UP-89-23\SU0002439\PRIOR TO 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C C r <br /> SAN JOAQUIN COUNTY PLANNING DIVISION ENVIRONMENTAL IMPACTS: <br /> INITIAL STUDY (to be completed by project planner) "Yes" may only be checked in situations where there is substantial <br /> evidence to indicate that there may be a significant impact on the <br /> environment if there is no change in the project description. (CEQA <br /> FILE f: e/P-FI-23 Guidelines, Sec. 1$064) <br /> PROJECT DESCRIPTION: il P 4PPua4rreN re d4749//J4 4 30 14V9JE See the Discussion section at the end of the Initial Study <br /> for explanation of any impacts checked "Yes." <br /> 8o4eD/4Cs JTIdLG Yes No <br /> RECOMMENDED ENVIRONMENTAL DETERMINATION: 1. Water: <br /> The proposed project could not have a significant effect a. Is any portion of the project within a <br /> on the environment, and a Negative Declaration will be Flood Hazard Area? ..®' <br /> prepared. What is the Plead Zone? Zr"c B <br /> Although the proposed project could have a significant b. Will the project result in reduction of <br /> effect on the environment, there will not be a significant surface or ground water quality or <br /> effect in this case because the mitigation measures quantity? <br /> described on an attached sheet have been added to the <br /> project. A Negative Declaration will be prepared. c. Will the project result in increased <br /> runoff or alteration to drainage patterns <br /> The proposed project mhave a significant effect on the and streams? <br /> environment, an Environmental Impact Report is required <br /> d. Will the project result in erosion of or <br /> sedimentation to a channel, river or <br /> ASSESSOR body of water? <br /> PARCEL f: 077-/00-30 GENERAL PLAN 4491e ULTl/IiE ZONING: •fL-/O <br /> 2. Earth (consider the Seismic Safety Element, <br /> CURRENT SITE CONDITIONS (topography, uses): Y¢/v4r� IIVAIe 4uA available geologic reports, etc. ): <br /> Jr48LE 4.A 4RCn4' 4C-4uy FL47 • 2/5 4aKeS a. Will the project result in or be subject <br /> ro potentially hazardous geologic or <br /> soils conditions on or immediately <br /> adjoining the site (slides, springs, <br /> SURROUNDING LAND USES: .S W 02 Ul42p erosions, liquifactic, ,, earthquake <br /> E: SeNooL 'PLAY,;ru uFl faults; slope, septic tank limitations)? <br /> b. Will the project involve substantial <br /> GENERAL CONSIDERATIONS: grading which could result in secondary <br /> 1. Does it appear that any environmental feature of ;9•e project will impacts (consider amount, steepness, <br /> generate significant public co ncern7 1 1 Yes. F) No. (Use the and visibility of proposed slopes; <br /> Discussion section at the end of the form if more room is consider effect of grading on trees <br /> required. ) and creek channels)? <br /> Mt,n'/alc cF Lr-/"/C4z Ill Vl' y/t-.J ZI"f<"•YGD IV41t,/ ADd R rzS <br /> Nature of concern: rnF F.y,b"s, Aue �Le..- PRo,Sr lny3, 7i/[ c. Will there be conversion of agricultural <br /> aFSPr udCs ,ocr Rnaz<u urA J,.;u.Fm4N,- <au cc.. land (consider prime farmland)? <br /> 2. Will the project require approval or permits by other than a <br /> County agency? 1 ) Yes. (iY No. 3. Plant._//,nimal Life: <br /> Agency name(s): <br /> a. Will there be a reduction rr disturbance <br /> to any habitat for plants and animals <br /> 3. Is the projecj within the Sphere of Influence of any city? (including removal or disturbance of trees, <br /> ( ) Yes. ( No. Name: riparian areas, or migration routes)? <br /> initial Study <br /> 1 _ t6-881 <br /> Initial Study - 2 - (6-88) <br />
The URL can be used to link to this page
Your browser does not support the video tag.