Laserfiche WebLink
� C r <br /> Yes No <br /> Yes No <br /> c. Will the project aCCecL rec reaLio na li pa rk <br /> b. Will theject ro impact any rare, opportuni tics (consider the General 6 <br /> P <br /> endangered, of recreational species Plan Recreation Element)? _ <br /> located on or near the site? <br /> 8. '1'ra nspor tatio n/Circulation: <br /> 4. Air: <br /> a. Will the pr+j ecL result in additional <br /> Will the project result in deterioration of traffic volumes or an increase in <br /> existing air quality, including creation of circulation problems (consider road <br /> objectionable odors; will future project design, access, congestion, parking, <br /> residents be subjected to significant /1 and accident potential)? <br /> pollution levels? <br /> to. Will the "ojeet result in special. <br /> 5. Nois__ transportation considvr,;1 ions ("ter- <br /> borne, rail, air, pad- s Arian, bicycle, <br /> a. Will the project expose people to high / or public transportation systems and /. <br /> noise or vibration levels? larking facilities)? _ <br /> b. Will the project result in increased �, c. Will Lho project result in an increase <br /> noise or vibration levels? in commuting to and from the local <br /> community? <br /> 6. Energy/ atural Resources/Hazards (consider <br /> the General Plan): d. Will the project be impacted or <br /> interfere with an airport flight pa!Al? _ <br /> a. Will the project result in any signifi- <br /> cant consumption of energy? �� e. Will the project restrict access to the <br /> surrounding area? <br /> b. Will the project affect the potential <br /> use, extraction, conservation, or 9. Cultural Resources: <br /> depletion of a natural resource other <br /> than agricultural land? Will the proposal result in an alteration <br /> of a significant ar a-o logi cal or historical <br /> c. Will the project create a risk of site, structure, or building? <br /> explosion, release or exposure to <br /> hazardous substances, or other ,d 10. Housino• <br /> dangers to public health and safety? <br /> Will the proposal adversely affect the <br /> 7. Utilities and Public Service; existing housing stock or create a demand pr <br /> for additional housing? <br /> •a. Will the project require alteration of, <br /> addition to, or the need for utility 11. Aesthetics: <br /> systems - water, sewer, drainage, solid <br /> waste - including sphere of influence or Will the project obstruct any public scenic <br /> district boundary change? vista or view, create an aesthetically <br /> offensive site open to public view, or // <br /> •b. Will the project result in the need for produce new light or glare? <br /> or the expansion of the following services: <br /> fire and police protection, schools, parks 12. Land Use <br /> and recreation, roads, flood control or <br /> other public works facilities, public a. Is this project a growth-inducing action <br /> transit, or governmental services? (encourage additional requests for related <br /> uses), or will it set a precedent in the ,,r <br /> ---yes- answers to these questions will require additional discussion, area? /—' <br /> but do not necessarily indicate a potentially significant impact. <br /> b. Will the project conflict with existing <br /> or planned Land uses? _ <br /> Initial Study - 3 - (6-88) <br /> Initial Study - 4 - (6-88) <br />