My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012338
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
2600 - Land Use Program
>
PA-1900118
>
SU0012338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:43 AM
Creation date
9/9/2019 11:03:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012338
PE
2632
FACILITY_NAME
PA-1900118
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
09344002
ENTERED_DATE
5/28/2019 12:00:00 AM
SITE_LOCATION
6484 N WAVERLY RD
RECEIVED_DATE
6/10/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\W\WAVERLY\6484\PA-1900118\SU0012338\APPL.PDF \MIGRATIONS\W\WAVERLY\6484\PA-1900118\SU0012338\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21SJCOG , Inc . <br /> This Project is subject to the SJMSCP. Per requirements of the SJMSCP this project must seek coverage due to <br /> required Army Corp permitting and Section 7 consultation This project is subject to a case-by-case review. This <br /> can be a 90 day process and it is recommended that the project applicant contact SJMSCP staff as early as <br /> possible. It is also recommended that the project applicant obtain an information package. http•//www.sicog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the <br /> following process must occur to participate in the SJMSCP: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground <br /> disturbance <br /> SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to <br /> any ground disturbance but no later than six(6)months from receipt of the n mms. If ITMMs are not signed within six months, <br /> the applicant must reapply for SJMSCP Coverage. Upon receipt of signed rrMMs from project applicant,SJCOG,Inc.staff will <br /> sign the rrMMs. This is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed rrMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the <br /> bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee tide;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project <br /> applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> C. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> ■ Receive your Certificate of Payment and release the required permit <br /> If you have any questions, please call (209)235-0600. <br />
The URL can be used to link to this page
Your browser does not support the video tag.