My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012338
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
2600 - Land Use Program
>
PA-1900118
>
SU0012338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:43 AM
Creation date
9/9/2019 11:03:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012338
PE
2632
FACILITY_NAME
PA-1900118
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
09344002
ENTERED_DATE
5/28/2019 12:00:00 AM
SITE_LOCATION
6484 N WAVERLY RD
RECEIVED_DATE
6/10/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\W\WAVERLY\6484\PA-1900118\SU0012338\APPL.PDF \MIGRATIONS\W\WAVERLY\6484\PA-1900118\SU0012338\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJCOG , Inc . <br /> S J C O G, Inc. <br /> San Joaquin County Multi-Species Habitat Conservation Open Space Plan <br /> 555 East Weber Avenue•Stockton,CA 95202• (209)235-0600 • FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department, Planning Department, <br /> Building Department Engineering Department Survey Department, Transportation <br /> Department, <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE E DISTUI BANCE <br /> CSO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County <br /> Multi-Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that <br /> agreement,the Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by <br /> the project applicant prior to any ground disturbance but no later than six(6)months from receipt of <br /> the ITMMs. If ITMMs are not signed within six months,the applicant must reapply for SJMSCP <br /> Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the <br /> ITMMs. This is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the <br /> ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant <br /> I must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project <br /> acreage being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever <br /> occurs first,the project applicant must: <br /> a Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> ` kI Y <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> _ Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> `-a Project Title: PA-1900118(SA) <br /> � f <br /> / Landowner: San Joaquin County Applicant: Kelly Milam <br /> Assessor Parcel#s: 093-440-02 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored <br /> and that appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.