Laserfiche WebLink
Tentative Map <br /> If the applicant files a full application, a revised tentative map will be required. The tentative <br /> map must show the following: <br /> • Dedications: Improvements and easements to be dedicated to the County. <br /> • Storm Drainage: The location of the proposed storm drainage facilities including <br /> collection facilities; detention and retention ponds; terminal facilities. <br /> • Location of World War II POW Camp wall <br /> Next Step <br /> When the applicant is ready to submit the full application, it will be necessary to do the following: <br /> • Submit seven copies (18" x 26") of the tentative map and two reduced copies (8'/i' x 11") <br /> of the tentative map. <br /> • Submit a Geo Technical Report. <br /> • Submit a Surface & Subsurface Contamination Report to the Environmental Health <br /> Department. Submit a receipt to the Community Development Department showing the <br /> study has been accepted by EHD. <br /> • Submit a Soils Suitability Study to the Environmental Health Department. <br /> • Submit the remaining portion of the Major Subdivision application fee. <br /> • Submit a "will-serve" letter for storm drainage. <br /> • Provide an updated letter from Western Farm Services indicating mitigation from the <br /> chemical plant. <br /> • Acoustical Study. <br /> PRE-APPLICATION DISCLAIMER <br /> NOTE: The Pre-application conference is designed to inform prospective applicants of <br /> General Plan consistency, zoning consistency, public improvement requirements, <br /> preliminary design constraints and opportunities, and major environmental and safety <br /> issues. This information is provided in the hope of assisting the applicant in submitting a <br /> better and more complete application, as well as minimizing processing time. It is not <br /> intended to be an in-depth analysis, and an environmental assessment is not completed. <br /> The applicant should be aware that a detailed review will not be done until the full <br /> application is submitted. Also, if new or additional information is obtained, a revised <br /> application or Environmental Impact Report may be required. <br /> MH:vb <br /> PA-0600353(SU)DCMH072606 <br /> Attachments <br /> C: Karnail Sandhu, Etal <br /> Triple E Surveying & Development <br /> 4 <br />