Laserfiche WebLink
SAN JOAQUIN Vf,.,-EY UNIFIED AIR POLLUTION <br /> '5_jNTROL DISTRICT <br /> Regulation VIII Fugitive Dust/PM-10 Synopsis <br /> Rule 8010 Administrative Requirements <br /> Requirements/lm plementation <br /> Section Applicability <br /> dust laopacity <br /> s <br /> 2.0 rfir � regulation to specified <br /> afugitive o <br /> ofine particulatematter(PM-1 ). (Fortpurpose of thsregulat on,visible emissons(VDE) s defined as-visible dust of such <br /> as to obscure an observers view to a degree equal to or greater than an opacity of 40%,for a period or periods aggregating more than three <br /> minutes in any one hour,except as set forth in Rule 8030,5.1.1 <br /> lronment;current <br /> 4.0 coetro�rneasuAels geeatelr�hanlll Rules)o equal tocthis regulation.ions pulaw <br /> bl c health&protect <br /> safety emergency operations Districtpermitted <br /> else hon 301dayses 'tvegetatrve <br /> reduction required by a Federal, State or local agency for fire prevention;and activities conducted above the elevation of 3000 feet(but not <br /> including reporting requirements specified in M Must <br /> mle eett ARS/EPAnactcePtabgity and r/water quality standards. <br /> 5.1 Chemical Stabilizing Agents. <br /> 5.4 Dust Palliative and Asphalt Paving. Shall comply with other applicable District Rules(i.e. Rule 4641). <br /> 5.5 Mud and Dirt Trackout. Requirements in this regulation do not exempt owners/operators from other agencies' required <br /> permits for dirt and mud cleanup. <br /> Rule 8020 Construction,Demolition, Excavation, Extraction <br /> 2.0 Applicability:Any construction,demolition, excavation,extraction,water mining related disturbances of sail, and the initial construction of <br /> landfills prior to commencement of landfill operations. for <br /> of structures 4.0 Exem <br /> ation <br /> ctivities; s: Land <br /> preparat( <br /> r rei)n for n del'mgractivities when including <br /> buildiingrarea is not increasedeparaon for cmore than 50%or 170,00 q.ft. (b tl nuot includingasling <br /> ancillary construction such as expanding parking lots);renovation of ground water recharge basins; activities approved prior to October 21, <br /> 1993;and solar drying &harvesting of sedimentary calcium carbonate precipitates. Compliance with Section 5.1 of this rule is not required <br /> where soil moisture or natural crusting is sufficient to limit VDE;. <br /> 5.1 Land clearing,grubbing,scraping, Effective dust suppression utilizing water,presoaking,wetting agent, or other surfactant. <br /> excavation,land leveling,grading, cut <br /> &fill,and demolition activities. <br /> Operation of wrecking balls or All exterior surfaces of a building up to six stories in height shall be wetted during demolition. <br /> wrecking equipment. Materials resulting from razing or demolition shall be wetted during off-site removal. <br /> 5.2 All disturbed areas of a construction Effective stabilization to limit VDE(40%)by utilizing water, a chemical stabilizer/suppressant,or <br /> site,including storage piles, not used planting vegetative ground cover. <br /> for seven or more days. . <br /> 5.3 On-site unpaved roads and off-site Effective control of fugitive dust to limit VDE(40°h)by utilizing water or a chemical stabilizer! <br /> unpaved access roads. <br /> suppressant. <br /> 24 <br /> hours. Recommend use of paved aprons,gravel strips, or wheel washers. The use of blower <br /> 5.4 Public paved roads,shoulders, and Limit or promptly remove any accumulation of mud or dirt at the end of work day s once every <br /> access ways adjacent to the site. <br /> devices for the removal off paved,cumulations is prohibited. The use of dry rotary brushes is prohibited, <br /> accompanied by wetting to limit dust <br /> except where preceded or <br /> emissiens. <br /> Rule 8030 Storage, Handling and Transport0f Bulk Materials <br /> 2.0 Applicability: Outdoor handling/storage of bulk material emitting visible dust. Additional requirements may apply if compliance with this Rule <br /> requires the installation or modification of equipment under existing DistriU permit. <br /> drying Of <br /> cient to <br /> it <br /> ea <br /> Co <br /> 4.0 nen <br /> age u�u�al crop materials;ihere moisture tiere momber harvestin'sure ccgtand storage of logsent of the material ; free matenals;Omatenals less agricultural <br /> 250 cubic yaharvesting and Pds eten re single site;and <br /> materials subject to damage by wetting. <br /> 5.1 Transport of bulk materials in an Chute/conveyer must be fully enclosed,or spray equipment wets materials to limit VDE washed, <br /> outdoor area fora distance of twelve opacity)as defined in District Rule 4101-Visible Emissions,or materials conveyed are washed, <br /> feet or greater with the use of a chute separated,or screened to remove PM-10. <br /> or conveyor device. <br /> 5.2 Materials transported by vehicle. Limit or promptly remove any accumulation of mud or dirt at the end of work day or once every 2 <br /> except equipment on site adding to or fop of the transport container,of(40%over ther provide at least six inches of freeboard space from the <br /> removing from storage piles. ° g ressant <br /> to <br /> 5.3 Outdoor storage of materials greater Cover <br /> vegetative cover within seventdaysDatte�the/additoln or removal of= <br /> f ma Hals.�lizer/supp <br /> I or <br /> than 250 cubic yards. <br /> gJPlNcega/cegacoMre99 2-2249 <br />