Laserfiche WebLink
P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> FN <br /> THOMAS R. FLINNDIRECTOR A' --ah STOCK ON,68-3 CALIFORNIA 9568-299 8 <br /> I (209)4 .co.0 FAX(209)468-2999 <br /> qp � � www.cosan-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR MAN <br /> UEL SOLORIO Worlemg for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE <br /> BUSINESS ADMINISTRATOR <br /> June 22,2004 <br /> MEMORANDUM <br /> TO: Kerry Sullivan,Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Jennifer Jolley <br /> Dry'V1IrUwf% <br /> FROM: D.Trueman Phillips, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: PA-04-268 A USE PERMIT APPLICATION FOR A NEIGHBORHOOD CHURCH <br /> TO BE BUILT IN 3 PHASES. PHASE ONE TO INCLUDE THE CONSTRUCTION <br /> OF A 6,000 SQUARE FOOT PRAYER HALL. PHASE TWO TO INCLUDE THE <br /> CONSTRUCTION OF A 12,000 SQUARE FOOT PRAYER HALL, AND THE <br /> PHASE ONE PRAYER HALL WILL BE CONVERTED INTO A DINING HALL <br /> KITCHEN. PHASE THREE WILL INCLUDE THE CONSTRUCTION OF A 6,000 <br /> SQUARE FOOT LIBRARY AND OFFICE. THE PROJECT WILL BE PHASED <br /> OVER A 7 YEAR PERIOD,LOCATED ON THE NORTHEAST CORNER OF <br /> WEST LANE AND ARMSTRONG ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Inder Singh, etal APPLICANT: R. S.Bagha <br /> ADDRESS: 12098 N.West Lane APN: 058-11040 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> West Lane has an existing right-of-way width of 110-feet and a planned right-Qf-way width of 110-feet. <br /> Armstrong Road has an existing right-of-way width of 60-feet and a planned right-0f--way width of 60- <br /> feet. <br /> The Applicant shall complete the following requirements before the Department of Public Works can <br /> support or deem complete the Site Plan for this project: <br /> REQUIREMENTS: <br /> 1. A traffic impact study shall be required to determine the impacts and mitigations of the proposed <br /> project. The developer shall deposit funds with the County for all costs,as estimated by the <br />