Laserfiche WebLink
Analysis <br /> Background <br /> The site contains an existing residence and two storage sheds. The storage shed located in the <br /> southwestern portion of the parking lot will be removed. Currently, there is a wooden fence surrounding the <br /> residence on the property. This fencing will be removed when the church is constructed. No permanent <br /> fencing is proposed. <br /> In the past, the site was used for pumpkin sales. The site has not been farmed in some time. The <br /> undeveloped portion of the property (approximately 3 acres)will remain in open space. <br /> Traffic Study <br /> The Department of Public Works required that a traffic impact study be prepared to review potential project <br /> related traffic impacts. The Department of Public Works reviewed the results of the study which determined <br /> that no additional mitigation measures beyond those normally required by the Department of Public Works <br /> were required for this project. <br /> San Joaquin County PA-0400268/Singh <br /> Community Development Page 3 <br />