My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005344
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
4620
>
2600 - Land Use Program
>
PA-0500531
>
SU0005344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:05:00 AM
Creation date
9/9/2019 11:11:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005344
PE
2627
FACILITY_NAME
PA-0500531
STREET_NUMBER
4620
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01709002
ENTERED_DATE
8/26/2005 12:00:00 AM
SITE_LOCATION
4620 E WOODBRIDGE RD
RECEIVED_DATE
8/26/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\4620\PA-0500531_PA-0300206\SU0005344\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. The project's north and south driveways shall be a minimum of 40 feet wide at the property line to <br /> ensure adequate turning space. <br /> d. The masonry wall shall be set back 15 feet from the road right-of-way at the project driveways to <br /> provide adequate sight distance. Any landscaping in the setback area will be limited to a maximum <br /> height of 3 feet. <br /> e. Dedication to result in a 30-foot-wide right-of-way from the centerline of Woodbridge Road to the <br /> property line shall be required across the frontage of APN 017-090-02. (Development Title Section <br /> 9-1150.5) <br /> f. Dedication to result in a 30-foot-wide right-of-way from the centerline of N. State Route 99 East <br /> Frontage Road to the property line shall be required across the frontage of APN 017-090-02. <br /> (Development Title Section 9-1150.5) <br /> g. The frontage improvement for Woodbridge Road shall be constructed in conformance with the <br /> standards for one-half of a 60-foot-wide right-of-way collector street. (Development Title Section 9- <br /> 11502) <br /> h. The frontage improvements for N. State Route 99 East Frontage Road shall be constructed in <br /> conformance with the standards for one-half of a 60-foot-wide right-of-way collector street. <br /> (Development Title Section 9-1150.2) <br /> i. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is $200.57 per trip-end generated in the <br /> Lodi area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> j. The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is $780.00 per 1,000 gross <br /> square feet of building designated as Commercial. The fee shall be automatically adjusted July 1 <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolution R-06-38) <br /> k. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> I. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> m. Drainage from the parcel shall be retained on the site by a retention basin meeting County <br /> standards. Drainage for the pond shall be calculated by a registered civil engineer or architect prior <br /> to issuance of building permits. The project shall also be designed to accept and retain additional <br /> volume runoff in the amount of four-acre-feet into the project, as shown in the Gill Creek and <br /> Woodbridge Road Watersheds Reconnaissance Study. An Inundation Easement shall be dedicated <br /> to the San Joaquin County Flood Control and Water Conservation District that provides for the <br /> periodic flooding of the project site. (Development Title Section 9-1135.9) <br /> n. The developer shall replace the existing 12-inch pipe across the project frontage along Woodbridge <br /> Road with an 18-inch pipe prior to issuance of building permits. <br /> o The developer shall construct or provide funds to construct the portion of the new pipe system <br /> across the project frontage along N. State Route 99 East Frontage Road, as shown in the Gill Creek <br /> and Woodbridge Road Watersheds Reconnaissance Study, prior to issuance of building permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.