Laserfiche WebLink
THOMAS R. FLINN P.O.BOX 1810-1810 E. HAZELTON AVENUE <br /> DIRECTOR STOCKTON,CALIFORNIA 95201-3018 <br /> (209)468-3000 FAX (209)468-2999 <br /> CgOFOp Nip '� www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR ,y > <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE <br /> BUSINESS ADMINISTRATOR <br /> September 27, 2005 <br /> MEMORANDUM <br /> TO: Chandler Martin, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Kathy Allen <br /> FROM: Michael R. Callahan, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: PA-05-531 A USE PERMIT APPLICATION FOR A RECREATION CAMPGROUND AND <br /> RECREATIONAL VEHICLE PARK. TO INCLUDE A 6,000-SQUARE-FOOT <br /> OFFICE/RECEPTION BUILDING, A 2,100-SQUARE-FOOT RECREATION HALL, A 2,500- <br /> SQUARE-FOOT MANAGERS BUILDING, FOUR 1,500-SQUARE-FOOT RESTROOM/ <br /> SHOWER BUILDINGS, A 900-SQUARE-FOOT PICNIC COVER AREA, AND 147 PARKING <br /> SPACES. ALL TO BE ENCLOSED BY AN 8-FOOT HIGH MASONRY WALL, LOCATED <br /> ON SOUTH SIDE OF WOODBRIDGE ROAD, 600 FEET EAST OF STATE HIGHWAY <br /> ROUTE 99. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Michael and Lisa Douglas APPLICANT: Jerry Greenmeyer <br /> ADDRESS: 4620 E. Woodbridge Road APN: 017-090-02 and 35 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Woodbridge Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 60 feet. <br /> State Highway Route 99 East Frontage Road has an existing right-of-way width that varies and a planned <br /> right-of-way width of the same. <br /> All proposed structures and improvements shall meet all Federal, State and San Joaquin County Ordinance <br /> requirements. <br /> The Applicant shall complete the following requirements before the Department of Public Works can support or <br /> deem complete the Site Plan for this project: <br /> REQUIREMENTS: <br /> 1. A traffic impact study shall be required to determine the impacts and mitigations of the proposed project. <br /> The developer shall deposit funds with the County for all costs, as estimated by the Department of Public <br /> Works Infrastructure Planning Division, prior to Department of Public Works preparing or contracting <br />