My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004715 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
6400
>
2600 - Land Use Program
>
PA-0400546
>
SU0004715 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:08 AM
Creation date
9/9/2019 11:12:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004715
PE
2690
FACILITY_NAME
PA-0400546
STREET_NUMBER
6400
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01710019, 20,21
ENTERED_DATE
11/24/2004 12:00:00 AM
SITE_LOCATION
6400 E WOODBRIDGE RD
RECEIVED_DATE
11/23/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\6400\PA-0400546\SU0004715\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reference Point (RP) Reference Point (RP) <br /> Original Ground (OG) Original Ground (OG) <br /> r <br /> Drill b" dia. hole <br /> r <br /> r M <br /> /f a <br /> IC 1 <br /> 4: dia. PVC pipe <br /> - <br /> Drill 4' dia. hole .SLI/)L, 5// <br /> 2" dia. PVC pipe <br /> 0 0 0 <br /> Drill 1/4" holes in PVC pipe 10e o <br /> I0 <br /> r � <br /> Gravel size 1/4"to 3/8' <br /> o 0 0 <br /> D O D R b <br /> Z <br /> i a o a <br /> h • O O O ` <br /> rf <br /> 2' Min, GravW <br /> Threaded or Gl <br /> Connection Joint SHALLOW HOLE Cdia. <br /> Lift Hole NTS <br /> Drift 1/4" holey in PVC pipe <br /> c <br /> Gravel size 1/4'to 3/8' <br /> 2` Min. Grovel <br /> DEEP HOLE (4"dia_) NOTES: <br /> NTS <br /> 1. Sleeve the We with PVC pip*- and grovel as soon as <br /> possible after drilling_ <br /> 2. Measure depth prior to reisase of driller. Deep hoses <br /> holes must be cleaned out by the driller. Shallow <br /> holes (42' deep) can be cleaned out with 4' auger. <br /> 3. O.K. to place more gravel on the exterior of the <br /> PVC Sleeve, than the minimum that is shown, <br /> / f 4. Use a funnel to pour water into the PVC pipe. <br /> ENGINEER: Earnest F. Smith HOLE PREPARATION (Deep/Shallow) APN:0. — 1,rr f-cj <br /> Fw I ftdowd by M n-n-W PERCOLATION TESTS DATE: z <br /> �f <br />
The URL can be used to link to this page
Your browser does not support the video tag.